Meeting Minutes<br />

lag= WEEKLY PROGRESS REVIEW MEETING C008753AO0<br />

Distribution<br />

CCN: 148834<br />

11111=01AM<br />

Christopher L. Beach<br />

W _IA I B January 19, 2010<br />

ATNDE<br />

DITRBUIO<br />

E. L. Adamson X3-40 S. C. Bentti X3-16<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

Q. L. Grist X3-16 M. D. Clancy X3-.16<br />

L. W. Grossartli X9-08 R. A. Dodd H14-24<br />

J. A. Heard H4-17 C. Flowers (DDI)<br />

W. R. Junkins X3-16 T. A. Foster N3-30<br />

P. Kennedy (DD I) R. Ganapathy X3-40<br />

S. E. Parnell X3-16 T. M. Greager X3-16<br />

M. Sherman (DDI) S. J. Henneman X3-16<br />

D. B. Teachout X3-16 R. A. Nunamaker X3-16<br />

A. S. White (DDI) J. Price (DDI)<br />

G. D. Barberi H4-18 D. G. Saueressig N3-30<br />

J. A. Ware N3-30<br />

H. Williams III X3-16<br />

A. E. Zacharias X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H4-1 1<br />

A meeting on the above subject was held on January 19, 2010 at 1 I18-K, MO-755.<br />

1. SAFETY<br />

0 Safety topic:. Compliance with speed limits on gravel roads entering the site and parking lot<br />

areas. Discussed the LSIT process and encourage use of LSIT programs.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

* DDI and WCH to discuss tank ladder fall protection requirements. DDI to propose providing<br />

JLG, manlift, etc. in process. WCH has this proposal for review. DDI is revising Fall Protection<br />

Plan. When this is complete, they will draft response and proposal to CNOO5. Whitney Sexmith<br />

is competent person for harness inspections. DDI resubmitted CN 005 proposal last week WCH<br />

in review. This is to be completed by 1/28/20 10. Discussed diesel tank ladder use. DDI Fall<br />

Protection plan has been returned status 2. DDI is evaluating comments.<br />

" Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and comments to be returned to RDC today. DDI incorporating<br />

comments and will resubmit. DDI to submit by 1/25/2010.<br />

Z:\Administrative Assistant~roject Progress Review Weekly Meetings\201 0\January\1 -19-10 Weekly Progress.doc