Progress Review Meeting<br />

Page 5<br />

(6/22) WCH received CAR today. (6/29) WCH is in review of the CAR (7/14) WCH QA<br />

would like DDI to update the letter provided in response with current information and dates.<br />

(7/20) DDI to submit letter with updated information on 7/27. (7/27) DDI to provide by 8/4.<br />

(8/3)<br />

o DDI to submit SDR completion response. All items are complete. (8/17)<br />

0 WCH QA will be conducting surveillance on contract flowdown and review of sub-tier QA<br />

programs. (5/25) This is ongoing. (6/1) There may be an issue with the flowdown of submittals<br />

between Watts and DDI. WCH QA suggests that DDI review their contract to determine if there<br />

is a breakdown. Per the WCH QA this is becoming an item of increasing interest for DOE and<br />

WCH. (6/8) DDI should be prepared for an inspection of their QA plan and flow-downs by<br />

WCH QA in the near future. (6/29) DDI provided copy of surveillance by WCH QA. This<br />

surveillance will be ongoing this week and next. (7/14) The surveillance will be conducted on<br />

7/22 for this site. (7/20) This surveillance is ongoing to additional sub-tiers. Results are not<br />

anticipated to be positive. There appears to be serious issues with flowdown of DDI QA plan to<br />

sub tiers. WCH QA is concerned about how the QA plan is being implemented by sub-tiers.<br />

These issues are of considerable concern to WCH. (7/27) DDI and WCH QA to meet to discuss<br />

flow downs. (8/3) WCH QA will be issuing letter to DDI outlining the details of the<br />

surveillance results.<br />

o WCH QA still has concern about DDI flowdown to WCI. DDI indicated that WCI has<br />

provided letter indicating they intend to work to the DDI QA plan. DDI indicated they have<br />

not assessed WCI to determine that WCI is adhering to the QA plan. (8/10) DDI would like<br />

a Kesponse in writing outlining the concerns that WCH QA has that WCI is not working to the<br />

DDI QA program. (8/17) WCH will be issuing SDR this week to DDI for deficiencies. (FR-<br />

201 0-IF-0664-SDR-023) (8/24)<br />

* WCH is still waiting on a procurement schedule for the fabrication items for Trench I. This has<br />

been requested by the FR director. WCH has requested that DDI include all work to be<br />

performed on the 3-week look-ahead schedule. (7/20) Jewel anticipated updating schedule on a<br />

weekly basis. (7/27) Jewell indicates they are on schedule. DDI will include milestone dates on<br />

the schedule for Trench 1. (8/3) Three-week look ahead scheduled has been updated to include<br />

fabrication milestones as provided by Jewell. (8/10)<br />

o How is DDI tracking the progress of the fabrication of equipment for Trench 1? (7/20)<br />

WCH RE is developing a list of acceptance criteria to be performed at Jewell' s<br />

facility prior to delivery. (8/3) WCH will provide a copy of the acceptance<br />

criteria to DDI. (8/24)<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

*DDI to submit REA for 100-K-2 confirmatory sampling. (6/22) DDI to submit by 6/30. (6/29)<br />

DDI submitted letter with questions about costs related to analysis of confirmatory sampling<br />

activities. WCH commits to providing a response to DDI by 7/19. (7/14) This will be issued by<br />

WCH will have response to DDI by 7/22. (7/20) WCH sent a letter in response - these costs are<br />

included in Exhibit "D" of the contract. DDI will be submitting a more detailed REA in response<br />

to this letter. (7/27) DDI is reviewing letter with legal counsel. Will follow up to WCH with a<br />

revised request. (8/3) No change. (8/17) No change. (8/24)<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

e See attached.<br />

* WCH requests as-built drawings of the energized water system. No update (5/4). No update.<br />

(5/11) SDR provided, no update. (5/18) No update. (5/25) No update. (6/8) Water line as-builts