Meeting Minutes<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach<br />

September 0 1, 2009<br />

ATEDE<br />

ISTRBUIO<br />

E. L. Adamson X3-40 S. C. Bentti X3-16<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

R. D. Belden (DDI) Q. L. Crist X3-16<br />

S. D. Bigham N3-30 R. A. Dodd H4-24<br />

M. R. Coy (DDI) T. A. Foster N3-30<br />

T. M. Greager X3-40 R. Ganapathy X3-40<br />

L. W. Grossarth X9-08 S. J. Henneman X9-08<br />

R. M. Harrison N3-30 M. F. Imhoff X9-08<br />

J. A. Heard H4-17 L. R. Miller (DD1)<br />

W. R. Junkins X3-16 D. L. Schilperoort T2-10<br />

S. E. Parnell X3-16 S. A. Strope (DDI)<br />

H. Williams HII N3-30 R. C. Voeks L6-06<br />

D. B. Teachout X9-l10 J. A. Ware N3-30<br />

A. S. White (DDI) Project File, X3-16<br />

D. J. Wonders (DDI) Records and Document Control 114-1 1<br />

A. E. Zacharias X9-08<br />

A meeting on the above subject was held on September 1, at I118-K, MO-7 55.<br />

1. SAFETY<br />

*Safety topic: Reminder that school has started and to watch out for kids' be careful if you are<br />

driving during the upcoming long weekend.<br />

11. ACTION ITEMS FROM LAST MEETING/STATUS<br />

" Drawings not complete; site layout is a post-start item and a status will be given at the Thursday<br />

meeting. DDI has initiated drawing designs. UPDATE: Contracts to be in place on 9/1/09.<br />

" Equipment List is in process, still on schedule to begin equipment inspections September 14th.<br />

" Have first DDI laborer walkdown and re-work air monitor 480V on ground cable signs and rope.<br />

" Sub-tier contractor training prior to beginning work (1WCP work responsibility, HASP, EP,<br />

IHAs, Fall Protection Plan)<br />

" Excavation Permit is being revised to include CTA and tent approach. Started 8/24/09 and is<br />

being expedited, expect completion in two to three weeks.<br />

" Waste Observer, Haz Mat and DOT training will be given to all craft. To be provided by WCH.<br />

V:\Administrative AssistarnAProject Progress Review Weekly Meefingsv2009\09-01-09 Weekly Propecss.doc