17.12.2013 Views

FOI_2011-00646_Enclosure - Hanford Site

FOI_2011-00646_Enclosure - Hanford Site

FOI_2011-00646_Enclosure - Hanford Site

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WCH closure<br />

Washington<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 152525<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach<br />

September 7, 2010<br />

E. L. Adamson X3-40 D. Bollinger (DDI)<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

Q. L. Grist X3-16 R. W. Cross H4-25<br />

T. Dance (DDI) X3-17 R. A. Dodd H4-24<br />

A. Gagnon X9-08 C. Flowers (DDI) X3-17<br />

J. A. Heard H4-17 T. A. Foster N3-30<br />

W. R. Junkins X3-16 R. Ganapathy X3-40<br />

H. C. Weber (DDI) X3-16 R. T. Hansen. H4-17<br />

H. Williams III X3-16 S. J. Huddleston X3-16<br />

S. E. Parnell X3-16<br />

D. G. Saueressig N3-30<br />

M. Sherman (DDI) X3-17<br />

D. B. Teachout X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-1 6<br />

Records and Document Control H441 I<br />

A meeting on the above subject was held on September 7, 2010 at 11 8-K, MQ-755.<br />

I. SAFETY<br />

a Safety topic: It is getting time to begin thinking about fall and winter maintenance items to<br />

prepare for the colder weather.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

0 PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with.the CHPRC 1 00-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/2010. Still waiting on permits from CHPRC.<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

work on water line on an off shift work day, pushing for Friday 2/19/2010. Excavation permit is<br />

complete. Discussed that 100-K water will be shut-off this weekend. Friday work is pending.<br />

Z:\Administrative Assistant\Project Progress Review Weekly Meetings\20l0\SeptembeW-07-lO<br />

Weekly Progress.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!