u~ance uestgns Inc.<br />

118-K-i Burial Ground Remediation Project<br />

Submittal Log<br />

_________________Date:<br />

8/17109 3:36 PM<br />

Lgn: Submitted Returned wlcomments Required Returned wlStatus "I<br />

Draft or Date Date Dt<br />

Submittal No./Description Rev. Send To Required Submitted Returned Status Comments<br />

O18K-SS-StO01-2-02f<br />

812012009 _<br />

2-02g Industrial Hygiene Program SC 30 days See 2-14 SSHASP<br />

Before Work<br />

_____<br />

2-02h Chronic Berylliurm Disease Prevention SC 30 days Not required until Be controls are required<br />

Program ____Before Work ___________for Trench I silos.<br />

2-0]i<br />

Fall Protection Program SC 30 days See 2-02 Sub S&H Program<br />

Before Work<br />

OlltK-SS-S051-2-02i 8/2i~61669-- -<br />

2-02i Respiratory Protection Pian 5t 30 days See 2-02 Sub S&H Program<br />

Before Work<br />

5t11K-SS-S0001-2-02i<br />

^8/20/2009--------------_______________<br />

2-02k Occapation Health Program SC 30 days See 2-14 SSHASP<br />

Before Work<br />

2-03 F~orm G06 "Subcontractor Worker Safety SC 30 days<br />

and Heaith Program Plan" (851 Mdatix)<br />

Before Work<br />

tll5K-SS-SOOO1-2-03 n/a -- -- 8/18/2009<br />

2-04 PS0-8, "Washington Closure <strong>Hanford</strong><br />

1IOCFR851 Compliance Matixe"<br />

SC 30 days<br />

Before Work<br />

St 18K-SSS01-2-04 n/a - 8/18/2009 -_____________<br />

2-05 Emergency Response Orientation<br />

Verification<br />

SC Before Work<br />

2-06 Subcontractor Monithly Accident and SC As Rq'd<br />

Injurytitlness Report<br />

2-07 Accidentjincident investigation Report SC As Rq'd<br />

Within 24 Hrs.<br />

2-08 List of Key Sapervisory and S&H SC Before Work<br />

Personnel<br />

5118K-SS-850t-2-08 n/a<br />

2-09 Job Specific Hazards Analysis SC As Rq'd<br />

2-10 Fire Protection-Pield SC Before Work<br />

2-1lOa<br />

Hot Work Control Plan SC Before Work We Need This Added Somewhere<br />

2-1 Ob PAt Designation SC Before Work<br />

011SK-SS-SOttO-2-10b n/a -8/20/2009 - -<br />

2-1 1 Hoisting and Rigging<br />

SC<br />

2-11a - Piano for Medium Lift. Heavy Lift and SIC Before Mob<br />

Other Lifts Designated as Critical<br />

2-11 b Crane Operator Qualifications SIC Before Mob ___ ____________________<br />

2-1 1 C Lift Suminaries for Lifts Performed by SC Before Mob<br />

Equipment Other Than Cranes<br />

2-12,Eacavation Permit SC Before Work ___ ------<br />

2-13 Industrial Hygiene S sR'<br />

2-13a Subcontractor Personnel Industnial SC Monthly<br />

Hygiene Monitoring Data<br />

2-13b Contractor Personnel Indastrial Hygiene SC Monthly<br />

monitoring Oata<br />

2-13c Berytliom Registry Informationj SC Semiannually