Progress Review Meeting<br />

Page 3<br />

*DDI is requesting a full scope of work for Trench 1. They believed this was supposed to have<br />

been provided as part of CN 010. WCH will look into this. (2/2) No update. (2/8)<br />

I11. PROJECT DESIGN DRAWINGS<br />

* None.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* See attached.<br />

* Trench I silos 3, 4, 5 and 2 have been excavated to the 10' level with no issues so far. (2/8)<br />

* Trench N has been down posted from a BCA.<br />

" No work this Friday.<br />

V. MANPOWER<br />

" None.<br />

" WCH to look into why HRA Gate Guard was asked to sign "exit" paperwork at AMH. (2/2) No<br />

update (2/8)<br />

VI.<br />

VII.<br />

EQUIPMENT<br />

0 No changes from last week.<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* None.<br />

VIII. MATERIAL<br />

*Until weather warms up, Dust Bond needs to be shipped in heated truck. These additional costs<br />

will be communicated to WCH as an REA. (1/18) To date one load has been delivered using the<br />

heated transport. (2/8)<br />

IX.<br />

QUALITY<br />

*WCH QA will be participating in a factual accuracy meeting with DOE tomorrow about the DDI<br />

QA plan. (1 /4) WCH did not receive any take away input from the meeting. (1 /12) This item<br />

will remain in the minutes until DOE has submitted their findings to WCH. (1/25)<br />

FUTURE ASSESSMENTS<br />

* WCH will be issuing SDR this week to DDI for deficiencies for DDI Procurement<br />

Controls/Control or Purchased Items and Services. (FR-2010-IF-0664-SDR-023) (8/24) WCH<br />

has received and accepted the CAP from DDI for SDR-023. Corrective action timeline has been<br />

extended to January. (11/9) WCH to perform surveillance for CAP implementation due 2/1/11.<br />

(1/12) WCH and DDI will meet to discuss. (2/8)<br />

" WCH will be performing a follow-up surveillance (to be completed by March) to verify the<br />

implementation of the corrective action plans for FR-201 0-IF-0749-SDR-024 and 025. This<br />

surveillance, when acceptable, will close out these two SDRs. (2/8)<br />

* WCH issued a new SDR to DDI relating to the OMP walkdown performed by WCH EPL. (1/18)<br />

FR-201 1-IF-201 1-0015-SDR-001 was submitted to DDI on 1/18/<strong>2011</strong>. WCH has received CAP<br />

from DDI on 1/20/11. (1/25) WCH EPL audit of OMP procedures last week. DDI is<br />

documenting when fuel is received, but not as it is being used. (2/2)