Dance Designs Inc.<br />

118-K-1 Burial Ground Remnediatian Project<br />

Submittal Log<br />

_______________Date:<br />

8117/09 3:36 PM<br />

Lgn: Submitted Returned w/comments Required Returned wlStatus '"V<br />

- Date_________ __<br />

Draft or Date Date Dt<br />

Siubmittal No./Description Rev. Send To Required Submitted Returned Statua Comments<br />

4-19 Monthly Estimate of Work Complete SA Before<br />

Payment __ ___ ___<br />

4-20 Invoice for Monthly Progress Payment SA As Rq'd ___ ______________________<br />

4-21 eond for Lien SA As Rq'd<br />

4-22 Expenditure Notification SA As Rq'd ___ __________________<br />

4-23 75% of Contract SA As Rq'd<br />

4-24 Progress Reports SA As Rq'd _ _________________ _____<br />

4-25 85% of Total Awounts Allocated SA As Rq'd<br />

4-26 Safety Incentive Pay SA As Rq'd____________________<br />

5-00 ENGINEERING________<br />

5-01 Drawings, Dat and Samples SIC As Rq'd<br />

5-01ia Drawings S C 14 days<br />

Before Work<br />

5-01b Samples SC 30 days<br />

Before Work_____<br />

5-1cData and Certificates SC 30 days<br />

Before Work _____<br />

5-Old<br />

Workrieg Drawings and Design Changes SC As Rq'd<br />

5-01le<br />

As-Bout Drawings SC 30 Days<br />

Before<br />

Balance<br />

5-011 As-Built Specifications SC As Rq'd ___<br />

5-Di g<br />

Energized Systems SC 30 days<br />

Before Work<br />

5-02 letrical Design<br />

SC<br />

Before Work<br />

8-00 QUALITY ASSURANCE PROGRAM ______ ___<br />

6-01 1 Quaity Assurance<br />

_______ OttK-SS-S55a1-6-010<br />

j<br />

Program SA rAs Rq'd J-<br />

7-00 OPER4ATIONS PROGRAMS __ _____ _______<br />

7-O1 WCH-DE-0t23,' CONDPS Subontractor SC Before Work<br />

Applicability and Plow-down Worsheet<br />

5118K-SS-Sgtt0l-7-Ol<br />

n/a<br />

7-02 Subcontractor Controlled or Generated SC Before<br />

Work Packages<br />

Balance<br />

7-03 Poteatially Distractive Written Material SC 10 days See 2-02 Chapter 1, Sect. 13, Bullet 3<br />

and Devices<br />

Before Work<br />

8-00 OTHER ADMINISTRATIVE SUBMITTALS ________ _________ ______ _________________<br />

8-01 Security Pmognam SC 30 __ Due Aug 7, 2009<br />

St ItK-SS-SOSS1 -8-0t<br />

8-02ljSecurty Incidents SC -As Rq'd _____<br />

9-00 OTHER TECHNICAL SUBMITTALS<br />

q-nlIAsbestos Abatement/Handlina Plan I I S(' I As Ron I I ISee 9-12 Earthwork Plan