Progress Review Meeting<br />

Page 2<br />

* Discussed gasoline fueling requirements in Burial Ground and how this will be addressed by<br />

Watts Construction. DDI to set some sort of control in place on the fuel tank and provide to<br />

WCH.<br />

* Discussed diesel fuel storage tank requirements, potential location, power needs and<br />

documentation requirements. Tank to be delivered 9/24. DDI to submit tank rigging plan and<br />

details, WCH to verify plan requirements for 8,000 gallon tank. DDI to submit tank details for<br />

hose and reel design. DDI to provide appropriate submittals<br />

* DDI and WCH to discuss tank ladder fall protection requirements.<br />

* Discussed Training and Work Package development schedule. JHA's and Tech Procedures<br />

scheduled to be completed this week.<br />

0 11H equipment to begin showing up in the next two weeks. 1H program submitted to and being<br />

returned with comments (WCH) this week.<br />

* WCH to clarify tritium downwind monitoring requirements. WCH checking on RadCon and<br />

Environmental requirements<br />

* Discussed site lighting in new walking, working areas and tent areas, all of which are to be<br />

verified for proper lighting.<br />

1I1. PROJECT DESIGN DRAWINGS<br />

*Electrical drawings and traffic control plan drawings are in process. Diesel storage tank electrical<br />

designs and trailer site electrical needs as-built drawings.<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

* None.<br />

V. WEEKLY PRODUCTION TABLE<br />

* None<br />

VI.<br />

VII.<br />

VIII.<br />

IX.<br />

MANPOWER<br />

* See attached.<br />

EQUIPMENT<br />

0 None.<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* None.<br />

MATERIAL<br />

* None.<br />

X. QUALITY<br />

*Discussed implementation of DDI QA and Training program, for the category 3 facility and<br />

regular assessments that will be conducted. Schedule of surveillances to be developed.<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

0 None<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* None.