Progress Review Meeting<br />

Page 5<br />

drawing. (6/29) WCH will also provide a CADO base file to DDI for this drawing. (7/6) DDI<br />

has received base CADD file and is in process of updating drawing. They commit to<br />

resubmitting drawing by 7/21. (7/14) DDI is working with their design group to get the drawings<br />

updated, but DDI has had issues with the CADD file, submission bumped to 7/26. (7/20) DDI is<br />

reviewing the cost of drawing; anticipate submittal of drawing by 8/3. (7/2 7) Submittal delivery<br />

has been pushed to 8/12. (8/3) Drawing should be available for DDI review from their sub-tier by<br />

8/18, they will submit to WCH for review no later than 8/23. (8/10) Draft of waterline drawing<br />

will be walked down this afternoon. (8/24) Continuing. (8/3 1) Drawings returned status 2 to<br />

DDI. DDI to rev drawing and it will be approved as status 1. (9/22) DDI anticipates Rev B.<br />

statused to Rev. 0 by COB this week. (1015)<br />

* WCH in review of site absence coverage plan. (10/5)<br />

" Discussed MAQSDR requirements. (1015)<br />

" DDI to submit manpower report to WCH on a monthly basis. (10/5)<br />

XIII.<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.<br />

" WCH will be issuing an additional change notice for trench I that will require provision of means<br />

and methods as well as materials such as ecology blocks. (8/10) DDI should plan for draft<br />

specification from WCH by the end of the week. (8/3 1) WCH still waiting on specifications from<br />

Design Engineering group to finalize issuing change notice for remainder of Trench I changes.<br />

XIV.<br />

XV.<br />

XVI.<br />

CORRESPONDENCE (since last meeting)<br />

" Weekly Progress Review Meeting Minutes 9/28/2010<br />

" Transmittal from DDI: CN Exhibit "K" Proposal (no cost)<br />

* Transmittal from DDI: Acknowledgement of CN 032<br />

" Transmittal from DDI: Acknowledgement of CN 031 (no cost)<br />

IN VOICE AND PAYMENT STATUS<br />

* DDI submitted September invoice today.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* Discussed shower facilities, PPE, towels, and janitorial DOR's.<br />

" Discussed plans for Jewell site visit (Portland). Discussion included schedule, logistics, etc.<br />

Schedule to be completed by 10/18/2010. <strong>Site</strong> visit to Portland will be scheduled.<br />

" DDI has not yet mobilized light plants per authorization in CN 019. Light plant is required to be<br />

on site no later than 10/01/2010.<br />