Progress Review Meeting<br />

Page 4<br />

V. WEEKLY PRODUCTION TABLE<br />

0 None provided.<br />

VI.<br />

VII.<br />

VIII.<br />

IX.<br />

MANPOWER<br />

*DDI is struggling to find another CTH to fill the CIII Key personnel position.<br />

*Bill McKee (CIII) is no longer on staff. DDI is pursuing another ClII candidate at this time<br />

with no success. No change. (5/11) DDI submitted two resumes for review, both meet<br />

minimum requirements. (5/18) DDI has retained Bill Bliss as CIH to the project. (5/25) Mr.<br />

Bliss will be a back-up CIII. DDI has submitted an additional resume for approval as primary<br />

CIII. (6/1)<br />

EQUIPMENT<br />

" See attached.<br />

* DDI should include the equipment on site being utilized as part of confirmatory sampling.<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* None.<br />

MATERIAL<br />

* None.<br />

X. QUALITY<br />

" Breathing air surveillance to be performed this week. WCH QA is waiting on information from<br />

subcontractor to complete. (5/25) Surveillance is complete. Qualifications of A. L. Compressed<br />

Gas Company for breathing air gasses and containers has been approved by DDI and confirmed<br />

by WCH QA as acceptable.<br />

" DDI has not yet responded to the Subcontractor Deficiency Report - FR-2010-IF-0045-SDR-010.<br />

(5/11) DDI to submit by Thursday, 5/20. (5/18) DDI submitted acceptable response to WCH on<br />

5/25/2010. (6/1)<br />

* DDI was issued SDR (FR-2010-IF-0382-SDR-015) on 5/17/2010 for as-built drawings. (5/25)<br />

No update. (6/1)<br />

* The Kenworth haul trucks are on hold for use with 25-ton cans until final certification data is<br />

provided. Submittal for certification was returned status 3. No update (5/4). No update. (5/11)<br />

No update. (5/18) No update. (6/1)<br />

*WCH issued SDR (FR-2010-LF-0092-017) to DDI on 5/24/2010 for shuttle truck<br />

specifications. (5/25) No update. (6/1)<br />

" WCH QA will be conducting a surveillance on contract flowdown and review of sub-tier QA<br />

programs. (5/25) This is ongoing. (6/1)<br />

" WCH QA submitted 2010 Surveillance Schedule to DDI identifying surveillances to be<br />

performed by the end of the calendar year. (Copy of schedule attached.) (6/1)<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

*DDI will be issuing an RFI for the scheduler position, duties and WCH expectations. No update<br />

(5/4). No update. (5/11) No change. (5/18) Received, WCH in review. (5/25) No update. (6/1)<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

*See attached.