WCH<br />

Closure<br />

<strong>Hanford</strong><br />

Meeting Minutes<br />

WashigtonCCN:<br />

148838<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach 7 > ~K >---<br />

January 26, 2010 "z<br />

E. L. Adamson X3-40 S. C. Bentti X3-16<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

Q. L. Grist X3-16 M. D. Clancy X3-16<br />

R. A. Dodd H4-24 C. Flowers (DDI)<br />

L. W. Grossarth X9-08 T. A. Foster N3-30<br />

J. A. Heard H4-17 R. Ganapathy X3-40<br />

W. R. Junkins X3-16 T. M. Greager X3-16<br />

P. Kennedy (DDI) S. J. Henneman X3-16<br />

S. E. Parnell X3-16 R. A. Nunamaker X3-16<br />

A. S. White (DDI) J. Price (DDI)<br />

H. Williams III X3-16 D. G. Saueressig N3-30<br />

M. Sherman (DDI)<br />

D. B. Teachout X3-16<br />

J. A. Ware N3-30<br />

A. E. Zacharias X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H-4- 11<br />

A meeting on the above subject was held on January 26, 2010 at 11 8-K, MO-755.<br />

1. SAFETY<br />

* Safety topic: Discussed driving in unpredictable and changing weather conditions. When<br />

traveling, make sure to have an emergency kit that is current. Also be watching for debris thrown<br />

up from tires and environmental changes.<br />

1I. ACTION ITEMS FROM LAST MEETING/STATUS<br />

* Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and comments to be returned to RDC today. DDI incorporating<br />

comments and will resubmit. DDI to submit by 1/28/20 10.<br />

* PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 1 00-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

Z;\Administrative Assistant\Project Progress Review Weekly Meeflngs\20 l0\lanuary\ 1-26-10 Weekly Progress.doc