Progress Review Meeting<br />

Page 6<br />

XVII. OTHER COMMENTS/NEW ACTION ITEMS<br />

* 1 00-K-78 pothole excavation for confirmatory sampling will be done on Friday, November 5.<br />

* A meeting will be held on Wednesday 10/27 at 2:00 with engineering to discuss the trench K<br />

odors and potential methods for additional engineering controls.<br />

* WCH asks if there is an "all-call" option available on the radios which, when triggered, makes an<br />

announcement over all of the radio channels. The option is not the scan function that<br />

automatically changes channels, but one that issues announcements simultaneously over all<br />

channels. WCH requests that DDI look into this and if available check into the costs of<br />

purchasing several for the project.<br />

0 WCH asks if it is feasible to set up a PID in the tent. DDI will evaluate. DDI has purchased a 36'<br />

extension wand for use with the 5-gas instrument, which is expected to be here this week.<br />