Progress Review Meeting<br />

Page 3<br />

* All Trench I silos have been excavated to the 10' level. As anticipated, around the 9 to 10 foot<br />

level the excavator encounters a lid like plate in Silo 6. There has been no dose associated with<br />

the plate at this time. The plan is to go back and continue remediation past the 10' level,<br />

beginning with silo 3. A question was raised whether the lid should be considered an anomaly.<br />

(2/15)<br />

" Trench N has now been posted as an HPA (High Particle Area.)<br />

V. MANPOWER<br />

* DDI announced that they will not be replacing their admin position at this time.<br />

VI.<br />

VII.<br />

EQUIPMENT<br />

" Watts will be removing Haul Truck #303 from service. DDI will be requesting release from the<br />

contract for that truck. (2/15)<br />

" Watts also anticipates reducing the number of excavators on site, with the John Deere 450<br />

machine being the one to leave site first as it is a rental. (2/15)<br />

WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

0 None.<br />

VIII. MATERIAL<br />

* None.<br />

IX.<br />

QUALITY<br />

*WCH QA will be participating in a factual accuracy meeting with DOE tomorrow about the DDI<br />

QA plan. (1/4) WCH did not receive any take away input from the meeting. (1/12) This item<br />

will remain in the minutes until DOE has submitted their findings to WCH. (1/25)<br />

FUTURE ASSESSMENTS<br />

* WCH will be issuing SDR this week to DDI for deficiencies for DDI Procurement<br />

Controls/Control or Purchased Items and Services. (FR-2010-LF-0664-SDR-023) (8/24) WCH<br />

has received and accepted the CAP from DDI for SDR-023. Corrective action timeline has been<br />

extended to January. (11/9) WCH to perform surveillance for CAP implementation due 2/1 /11.<br />

(1/12) WCH and DDI will meet to discuss. (2/8) WCH QA is working on a compensatory plan<br />

for DDI. (2/15)<br />

* WCH will be performing a follow-up surveillance (to be completed by March) to verify the<br />

implementation of the corrective action plans for FR-2010-WF-0749-SDR-024 and 025. This<br />

surveillance, when acceptable, will close out these two SDRs. (2/8) WCH project management<br />

will be meeting today to review completion of SDR actions. (2/22)<br />

" WCH issued a new SDR to DDI relating to the OMP walkdown performed by WCH EPL. (1/18)<br />

FR-201 I -IF-201 l-0015-SDR-O01 was submitted to DDI on 1/18/<strong>2011</strong>. WCH has received CAP<br />

from DDI on 1/20/11. (1/25) WCH EPL audit of OMP procedures last week. DDI is<br />

documenting when fuel is received, but not as it is being used. (2/2) WCH rejected the initial<br />

CAP from DDI. A second response was submitted by DDI and WCH has approved. (2/15)<br />

WCI- project management will be meeting today to review completion of SDR actions. (2/22)