Progress Review Meeting<br />

Page 2<br />

* Remediation PSR Checklist draft in process of review. Completion of items in process. Scheduled<br />

completion 10/22. All items should be submitted relating to the PSR no later than 10/22. PSR<br />

Management review for sign off will be 10/28/2009. DDI requested to follow up on QA and<br />

Training plans and then meet with E. Adamson.<br />

* Discussed gasoline fueling requirements in Burial Ground and how this will be addressed by<br />

Watts Construction. DDI to set some sort of control in place on the fuel tank and provide to<br />

WCH. DDI has determined that no vehicle mounted fueling tanks for gasoline will be on site.<br />

* Discussed diesel fuel storage tank requirements, potential location, power needs and<br />

documentation requirements. Tank to be delivered 9/24. DDI to submit tank rigging plan and<br />

details, WCH to verify plan requirements for 8,000 gallon tank. DDI to submit tank details for<br />

hose and reel design. DDI to provide appropriate submittals<br />

" DDI and WCH to discuss tank ladder fall protection requirements. DDI to propose providing<br />

JLG, manlift, etc.<br />

" 1H equipment to begin showing up in the next two weeks. 1H program submitted to and being<br />

returned with comments (WCH) this week. WCH current in review of these. 1H equipment is<br />

on-site, excavators are being set up and personnel are in training.<br />

" WCH to clarify tritium downwind monitoring requirements. WCH checking on RadCon and<br />

Environmental requirements. DOE has agreed with proposal and it has been forwarded to EPA<br />

for review/concurrence.<br />

" Discussed site lighting in new walking, working areas and tent areas, all of which are to be<br />

verified for proper lighting. Discussion continued on alternative light sources such as light plant<br />

at rail crossing into site, additional parking lot and entrance lighting.<br />

* Discussed WCH tobacco use policy, designated smoke areas, etc. WCH will be establishing<br />

designated smoking areas. WCH will enforce this policy.<br />

" Need Electrical Drawings for electrical tie-ins.<br />

" WCH requested status of Cold Weather Protection plan from DDI.<br />

" DDI needs to abide by the approved bucket truck inspection plan. Per DDI the bucket truck will<br />

be on-site 10/15/2009. WCH Safety to follow up on aerial lift and associated fall protection<br />

requirements. DDI to verify/confirm electricians fall protection training.<br />

" Schedule for emergency drill preparation was discussed. Drill was performed 10/15. Field drill<br />

options discussed.<br />

" Modesty clothing/laundry service will be provided and blues as well as towels.<br />

1II.<br />

IV.<br />

PROJECT DESIGN DRAWINGS<br />

*Electrical drawings and traffic control plan drawings are in process. Diesel storage tank electrical<br />

designs and trailer site electrical needs as-built drawings.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

0 None.<br />

V. WEEKLY PRODUCTION TABLE<br />

* None<br />

VI.<br />

MANPOWER<br />

0 None.