Meeting Minutes<br />

CCN: 149671<br />

lg<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

E aMelk~i Christopher L. Beach<br />

Ely-AI=March 23, 2010<br />

* S m -: 0IO<br />

E. L. Adamson X3-40 R. D. Cantwell N3-30<br />

C. L. Beach X3-16 R. W. Cross H4-25<br />

D. Bollinger (DDI) C. Flowers (DDI) X3-17<br />

Q. L. Crist X3-16 R. A. Dodd H4-24<br />

A. Gagnon X9-08 T. A. Foster N3-30<br />

J. A. Heard H4-17 R. Ganapathy X3-40<br />

W. R. Junkins X3-16 L. W. Grossarth X9-08<br />

P. Kennedy (DDI) X3-17 S. E. Parnell X3-16<br />

A . S. White (DDI) X3-17 D. G. Saueressig N3-30<br />

NM. Sherman (DDI) X3-17<br />

D. B. Teachout X3-16<br />

J. A. Ware N3-30<br />

H. Williams III X3-16<br />

A. E. Zacharias X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H4- 11<br />

A meeting on the above subject was held on March 23, 2010 at 118-K, MO-755.<br />

I. SAFETY<br />

*Safety topic: Be watchful for deer and other wildlife during commutes. Also be aware that<br />

irrigation canals are being filled. Just this week, a young boy drowned when he slipped into a<br />

canal.<br />

1I. ACTION ITEMS FROM LAST MEETING/STATUS<br />

" Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and comments to be returned to RDC today. DDI incorporating<br />

comments and will resubmit. DDI to submit by 1/28/20 10. WCH has received, in preliminary<br />

review, will return this week. WCH returned to DDI, status 2, with comments. DDI will be<br />

doing a walkdown with Mr. Teachout to incorporate comments and will resubmit drawings for<br />

approval. DDI to check on status. DDI waiting on North Point. DDI still waiting on North<br />

Point. They have exceeded the 30-day expected response to a returned submittal.<br />

* PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />