WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

1111=4kM Christopher L. Beach ~ 9<br />

September 08, 2009<br />

DI3STRIBTIO<br />

C. L. Beach X3-16 E. L. Adamson X3-40<br />

R. D. Belden (DDI) S. C. Bentti X3-16<br />

M. R. Coy (DDI) S. D. Bighamn N3-30<br />

D. E. Faulk L6-06 R. D. Cantwell N3-30<br />

T. M. Greager X3-40 Q. L. Crist X3-16<br />

L. W. Grossarth X9-08 R. A. Dodd H4-24<br />

S. J. Henneman X9-08 T. A. Foster N3-30<br />

D. E. Herman (Watts) R. Ganapathy X3-40<br />

W. R. Junkins. X3-16 R. M. Harrison N3-30<br />

S. E. Parnell X3-16 J. A. Heard H14-17<br />

S. A. Strope (DDI) M. F. Imhoff X9-08<br />

D. B. Teachout X9- 10 D. L. Schilperoort T2-10<br />

H. Williams III N3-30 R. C. Voeks L6-06<br />

A. S. White (DDI) J. A. Ware N3-30<br />

D. J. Wonders (DDI) Project File, X3-16<br />

A. E. Zacharias X9-08 Records and Document Control H4- 11<br />

A meeting on the above subject was held on September 8, at 1 I18-K, MO-755.<br />

I. SAFETY<br />

* Safety topic: Reminder to take care of yourself and your personal health and wellness.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

*DDI to use ARES Corp. for design work and Rogers for surveying work.<br />

*Equipment List is in process, still on schedule to begin equipment inspections September 14th.<br />

*Have first DDI laborer walkdown and re-work air monitor 480V on ground cable signs and rope.<br />

*Sub-tier contractor training prior to beginning work (IWCP work responsibility, HASP, EP,<br />

JHAs, Fall Protection Plan)<br />

*Excavation Permit is being revised to include CTA and tent approach. Started 8/24/09 and is<br />

being expedited, expect completion in two to three weeks.<br />

*Waste Observer, Haz Mat and DOT training will be given to all craft. To be provided by WCH.<br />

*Plan to start DDIIWatts Construction craft on-site the week of 9/14/09<br />

*Trailer mobilization has been pushed back to week of 9/8/09. DDI does not yet have their<br />