Progress Review Meeting<br />

Page 5<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

0 None.<br />

TECHNICAL DATA SUBMITTALS/STATIJS<br />

" See attached.<br />

" WCH requests as-built drawings of the energized water system. No update (5/4). No update.<br />

(5/11) SDR provided, no update. (5/18) No update. (5/25) No update. (6/8) Water line as-builts<br />

are being marked up for WCH review prior to being submitted. WCH stressed that the as-builts<br />

need to indicate the location of the water lines from hook up at the fence to the high tower. (6/8)<br />

No change. (6/15) No change. (6/22) WCH to provide new drawing number for the as-built<br />

drawing. (6/29) WCH will also provide a CADD base file to DDI for this drawing. (7/6) DDI<br />

has received base CADD file and is in process of updating drawing. They commit to<br />

resubmitting drawing by 7/21. (7/14) DDI is working with their design group to get the drawings<br />

updated, but DDI has had issues with the CADD file, submission bumped to 7/26. (7/20) DDI is<br />

reviewing the cost of drawing; anticipate submittal of drawing by 8/3. (7/27) Submittal delivery<br />

has been pushed to 8/12. (8/3) Drawing should be available for DDI review from their sub-tier by<br />

8/18, they will submit to WCH for review no later than 8/23. (8/10) Draft of waterline drawing<br />

will be walked down this afternoon. (8/24) Continuing. (8/3 1) Drawings returned status 2 to<br />

DDI. DDI to rev drawing and it will be approved as status 1. (9/22) DDI anticipates Rev B. to be<br />

submitted Rev. 0 by COB this week. (10/5)<br />

" WCH in review of site absence coverage plan. (10/5)<br />

* Discussed MAQSDR requirements. (10/5)<br />

" DDI to submit manpower report to WCH on a monthly basis. (10/5)<br />

" DDI to provide WCH with MSDS sheets for Dust Bond and Propylene glycol. (10/12)<br />

XIII. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

* See attached.<br />

" WCH will be issuing an additional change notice for trench I that will require provision of means<br />

and methods as well as materials such as ecology blocks. (8/10) DDI should plan for draft<br />

specification from WCH by the end of the week. (8/3 1) WCI- still waiting on specifications from<br />

Design Engineering group to finalize issuing change notice for remainder of Trench I changes.<br />

XIV.<br />

XV.<br />

XVI.<br />

CORRESPONDENCE (since last meeting)<br />

0 Weekly Progress Review Meeting Minutes 10/5/2010<br />

INVOICE AND PAYMENT STATUS<br />

0 September invoice approved.<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

* Discussed use of change trailer for coats, PPE, etc.<br />

* Acid overpack decon needs to be completed.<br />