01.02.2014 Views

TABLE OF CONTENTS - Department of Public Social Services

TABLE OF CONTENTS - Department of Public Social Services

TABLE OF CONTENTS - Department of Public Social Services

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Los Angeles COUNTY<br />

<strong>Department</strong> <strong>of</strong> <strong>Public</strong> <strong>Social</strong> <strong>Services</strong><br />

LEADER Replacement System (LRS)<br />

85<br />

86<br />

87<br />

88<br />

89<br />

90<br />

91<br />

92<br />

93<br />

94<br />

95<br />

96<br />

97<br />

98<br />

99<br />

100<br />

101<br />

102<br />

103<br />

104<br />

105<br />

106<br />

107<br />

108<br />

109<br />

110<br />

111<br />

112<br />

113<br />

http://www.whitehouse.gov/omb/egov/a-6-trm.html<br />

Functional requirements are based on COUNTY-specified User roles, related<br />

activities and services, DPSS Systems and DCFS Systems capabilities, and<br />

planned enhancements. These requirements shall be organized into component<br />

services, provided by the LRS Application S<strong>of</strong>tware and supported by the LRS<br />

technical infrastructure.<br />

In developing the LRS requirements, COUNTY has made a distinction between<br />

the LRS Application S<strong>of</strong>tware and the technical infrastructure that supports the<br />

LRS. Together, the LRS Application S<strong>of</strong>tware and its supporting technical<br />

infrastructure are the LRS S<strong>of</strong>tware and LRS Hardware; however, the LRS<br />

Application S<strong>of</strong>tware shall be independent <strong>of</strong> the technical infrastructure. The<br />

LRS Application S<strong>of</strong>tware design and performance shall be isolated from the<br />

particulars <strong>of</strong> the underlying hardware, operating systems, and common system<br />

management utilities, allowing the LRS Application S<strong>of</strong>tware to be easily rehosted<br />

into a different physical environment. Interfaces shall be established and<br />

maintained within the LRS Application S<strong>of</strong>tware and technical infrastructure.<br />

All Local Office Site hardware, s<strong>of</strong>tware, peripherals, and network(s) will be the<br />

responsibility <strong>of</strong> COUNTY. COUNTY will also assume responsibility for<br />

LAnet/EN connectivity and availability from a CONTRACTOR-provided<br />

Gateway to Local Office Sites as well as other COUNTY locations.<br />

1.1 SUMMARY <strong>OF</strong> LRS FUNCTIONAL REQUIREMENTS:<br />

The functional requirements contained in Section 2 (Functional Requirements) <strong>of</strong><br />

this Attachment B specify the detailed business needs for the LRS. These<br />

requirements were developed at a point in time. Final functionality and design<br />

shall be based on all applicable federal, State, and local laws, rules, regulations,<br />

ordinances, guidelines, directives, policies, and procedures current at the time <strong>of</strong><br />

LRS Application S<strong>of</strong>tware design. However, CONTRACTOR shall endeavor to<br />

utilize COUNTY’s existing business logic to the maximum extent possible, in<br />

order to minimize the impact to COUNTY.<br />

LRS RFP - Attachment B (SOR) Page 4 November 30, 2007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!