Los Angeles COUNTY<br />

<strong>Department</strong> <strong>of</strong> <strong>Public</strong> <strong>Social</strong> <strong>Services</strong><br />

LEADER Replacement System (LRS)<br />

5800<br />

5801<br />

5802<br />

5803<br />

5804<br />

5805<br />

5806<br />

5807<br />

5808<br />

5809<br />

5810<br />

5811<br />

5812<br />

5813<br />

5814<br />

5815<br />

5816<br />

5817<br />

5818<br />

5819<br />

5820<br />

5821<br />

5822<br />

5823<br />

5824<br />

5825<br />

5826<br />

5827<br />

5828<br />

5829<br />

5830<br />

5831<br />

5832<br />

5833<br />

5834<br />

5835<br />

5836<br />

5837<br />

5838<br />

security <strong>of</strong>ficers, video surveillance with taping capabilities, a secure<br />

loading area, and on-site shredding capabilities.<br />

15. The Central Print Facility and Backup Print Facility shall be capable <strong>of</strong><br />

generating all documents. In meeting this requirement,<br />

CONTRACTOR considerations shall include:<br />

a. The existing LEADER System design, the LRS design, and<br />

architectural differences;<br />

b. Growth <strong>of</strong> caseload, usage, and storage <strong>of</strong> LRS Data; and<br />

c. Central print output volumes <strong>of</strong> the DPSS Systems and DCFS<br />

Systems.<br />

16. The LRS shall include formatting or reformatting <strong>of</strong> all documents and<br />

envelopes for mailing so that they are in full compliance with all<br />

United States Postal Service (USPS) procedures and regulations that<br />

maximize postal savings and allow for automated reading <strong>of</strong> ZIP<br />

codes.<br />

3.3.3.1. Central Print Service Requirements.<br />

1. The LRS shall complete full backups <strong>of</strong> all Central Print<br />

Facility systems, databases, and generated reports weekly on<br />

Sunday after the completion <strong>of</strong> all processing for the previous<br />

week and prior to the start <strong>of</strong> business at 6:00 a.m. on<br />

Monday. The full backups shall be sent to the <strong>of</strong>f-site file<br />

storage facility provided by CONTRACTOR and approved<br />

by COUNTY.<br />

2. The LRS shall complete incremental backups <strong>of</strong> the Central<br />

Print Facility server daily Monday through Saturday. The<br />

incremental backups shall be sent to the <strong>of</strong>f-site file storage<br />

facility provided by CONTRACTOR and approved by<br />

COUNTY.<br />

3. The LRS shall maintain <strong>of</strong>f-site file storage from the print<br />

servers daily for thirty (30) cycles. The <strong>of</strong>f-site file storage<br />

facility provided by CONTRACTOR must be approved by<br />

COUNTY.<br />

4. The LRS shall include a strategy for storing print<br />

configuration files.<br />

3.3.3.2. Mail Requirements.<br />

1. The Central Print Facility and Backup Print Facility shall be<br />

capable <strong>of</strong> mailing all pieces <strong>of</strong> mail generated. In meeting<br />

this requirement, CONTRACTOR considerations shall<br />

include:<br />

LRS RFP - Attachment B (SOR) Page 166 November 30, 2007