01.10.2013 Views

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sludge Treatment Project Engineered Container Retrieval and Transfer System December 2011<br />

B. Where deficiencies are found or fire-resistive joint systems are damaged or removed due to<br />

testing, repair or replace fire-resistive joint systems so they comply with requirements.<br />

C. Proceed with enclosing fire-resistive joint systems with other construction only after inspection<br />

reports are issued and installations comply with requirements.<br />

3.4 FIRE-RESISTIVE JO<strong>IN</strong>T SYSTEM SCHEDULE<br />

A. Where UL-classified systems are indicated, they refer to system numbers in UL's "Fire<br />

Resistance Directory" under product Category XHBN.<br />

B. Wall-to-Wall, Fire-Resistive Joint Systems:<br />

1. UL-Classified Systems: WW-D - 0000-0999.<br />

C. Floor-to-Wall, Fire-Resistive Joint Systems:<br />

1. UL-Classified Systems: FW-D - 0000-0999.<br />

D. Head-of-Wall, Fire-Resistive Joint Systems:<br />

1. UL-Classified Systems: HW-D - 0000-0999.<br />

END OF <strong>SECTION</strong> 078446<br />

Contract 44577 KW Annex - Rev. D 44577-CSI-SPEC-001 078446 - 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!