Sludge Treatment Project Engineered Container Retrieval and Transfer System January 2012<br />

C. Flange bolt torque values shall be per gasket manufacturer recommendation not to exceed 75%<br />

of bolt allowable yield strength as defined in the applicable ASTM standard and using appropriate<br />

bolt torque patterns as shown in ASME PCC-1-2010, Appendix F.<br />

3.7 LABEL<strong>IN</strong>G AND IDENTIFICATION<br />

A. Install identifying labels and devices for piping, valves, and specialties. Label piping system in<br />

accordance with Section 220553, Identification for Plumbing Piping and Equipment.<br />

3.8 FIELD QUALITY CONTROL<br />

A. Testing Agency: Buyer will engage qualified testing agency to perform field tests and<br />

inspections of piping and prepare test reports.<br />

B. Perform field tests and inspections of piping and prepare test reports.<br />

C. Tests and Inspections:<br />

1. Piping Testing Coordination: Perform tests, inspections, verifications, and certification<br />

of piping systems concurrently with tests, inspections, and certification of interfacing<br />

systems.<br />

2. Inspect Pressure or flow regulators for proper operation.<br />

3. Preparation: Perform the following Installer tests:<br />

a. Initial blow down.<br />

b. Initial pressure test.<br />

c. Hydrostatic test for positive pressure piping.<br />

4. Perform the following tests on IXM piping:<br />

a. Use ambient temperature water as a testing medium unless there is risk of damage<br />

due to freezing. Another liquid that is safe for workers and compatible with piping<br />

may be used.<br />

b. While filling system, use vents installed at high points of system to release air.<br />

Use drains installed at low points for complete draining of test liquid.<br />

c. Isolate any tanks and determine that the IXM system is full of water.<br />

d. Subject piping system to hydrostatic test pressure that is not less than 1.5 times the<br />

system's working pressure. Test pressure shall not exceed maximum pressure for<br />

any vessel, pump, valve, or other component in system under test. Hydrostatic test<br />

Contract 44577 KW Annex – Rev E. 44577-CSI-SPEC-001 402319-25