01.10.2013 Views

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Sludge Treatment Project Engineered Container Retrieval and Transfer System December 2011<br />

D. Remove and replace malfunctioning units and retest as specified above.<br />

3.4 DEMONSTRATION<br />

A. Engage a factory-authorized service representative to train Owner's maintenance personnel to<br />

adjust, operate, and maintain transient voltage suppression devices. Refer to Division 01<br />

Section "Demonstration and Training."<br />

END OF <strong>SECTION</strong> 264313<br />

Contract 44577 KW Annex - Rev. D 44577-CSI-SPEC-001 264313 - 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!