01.10.2013 Views

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sludge Treatment Project Engineered Container Retrieval and Transfer System January 2012<br />

3.2 GAUGE APPLICATIONS<br />

A. Install liquid fillable-case-type pressure gauges for discharge of each pressure-reducing valve.<br />

B. Install liquid fillable-case-type pressure gauge at heat pump chiller.<br />

C. Install liquid fillable-case-type pressure gauges at each pump.<br />

3.3 <strong>IN</strong>STALLATIONS<br />

A. Install direct-mounting thermometers and adjust vertical and tilted positions.<br />

B. Install remote-mounting dial thermometers on panel, with tubing connecting panel and<br />

thermometer bulb supported to prevent kinks. Use minimum tubing length.<br />

C. Install thermowells with socket extending to center of pipe and in vertical position in piping tees<br />

where thermometers are indicated.<br />

D. Duct Thermometer Support Flanges: Install in wall of duct where duct thermometers are<br />

indicated. Attach to duct with screws.<br />

E. Install direct-mounting pressure gauges in piping tees with pressure gauge located on pipe at<br />

most readable position.<br />

F. Install needle-valve fitting in piping for each pressure gauge for fluids.<br />

G. Install test plugs in tees in piping.<br />

H. Install connection fittings for attachment to portable indicators in accessible locations.<br />

3.4 CONNECTIONS<br />

A. Install meters and gauges adjacent to machines and equipment to allow service and maintenance<br />

for meters, gauges, machines, and equipment.<br />

3.5 ADJUST<strong>IN</strong>G<br />

A. Calibrate meters according to manufacturer's written instructions, after installation.<br />

B. Adjust faces of meters and gauges to proper angle for best visibility.<br />

END OF <strong>SECTION</strong> 230519<br />

Contract 44577 KW Annex - Rev. E 44577-CSI-SPEC-001 230519 - 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!