SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sludge Treatment Project Engineered Container Retrieval and Transfer System January 2012<br />

a. Repair leaks and retest until no leaks exist.<br />

5. System Verification; perform the following tests and inspections:<br />

a. Valve test.<br />

b. Piping purge test.<br />

c. Piping purity test.<br />

d. Final tie-in test.<br />

e. Operational pressure test.<br />

f. Verify correct labeling of equipment and components.<br />

6. Testing Certification: Certify that specified tests, inspections, and procedures have been<br />

performed and certify report results. Include the following:<br />

a. Inspections performed.<br />

b. Procedures, materials, and gases used.<br />

c. Test methods used.<br />

d. Results of tests.<br />

D. Remove and replace components that do not pass tests and inspections and retest as specified<br />

above.<br />

Contract 44577 KW Annex - Rev. E 44577-CSI-SPEC-001 431510 - 26