Sludge Treatment Project Engineered Container Retrieval and Transfer System December 2011<br />

<strong>SECTION</strong> 400527 - PIP<strong>IN</strong>G AND TUB<strong>IN</strong>G <strong>IN</strong>SPECTION CHECKLIST<br />

PART 1 GENERAL<br />

1.1 <strong>SECTION</strong> <strong>IN</strong>CLUDES<br />

A. Inspection of piping and tubing installations per design documents<br />

B. Inspection of installation workmanship<br />

C. Leak Testing<br />

1.2 QUALITY ASSURANCE AND TEST<strong>IN</strong>G<br />

A. Perform inspections and testing in accordance with Division 22 Sections “Nitrogen Gas<br />

Piping”, and “General-Service Compressed Air Piping”, and Division 40 Sections,<br />

“Process Plant Non-Potable Water Pipe (Modified for IXM)” and “Compression Fittings<br />

on Copper and Stainless Steel Tubing”.<br />

B. Quality Assurance Program<br />

PART 2 PRODUCTS<br />

Not used.<br />

PART 3 EXECUTION<br />

1. For all work, the fabricator is required to develop and implement a documented<br />

quality assurance (QA) program which complies with the Contractor Requirements<br />

Document (CRD) of DOE Order 414.1 (latest).<br />

2. The fabricator is responsible for maintaining quality and shall perform in-process<br />

and final inspection on his work as required herein. The fabricator must comply<br />

with all applicable federal, state, or local codes.<br />

3.1 <strong>IN</strong>SPECTION ATTRIBUTES<br />

A. General:<br />

1. Approved design documents present.<br />

2. Code to which it was designed identified (e.g., UPC, applicable ASME B31 code).<br />

3. Design followed:<br />

a. Required materials used (metal, polymer, schedule, markings per material<br />

standard on tube, pipe, and fittings).<br />

b. No counterfeit materials.<br />

4. Routing layout, configuration.<br />

5. Elevations (if elevation is critical).<br />

6. Slope (if slope is critical).<br />

Contract 44577 KW Annex – Rev. D 44577-CSI-SPEC-001 400527-1