Sludge Treatment Project Engineered Container Retrieval and Transfer System January 2012<br />

1. Comply with ASME B31.3, "Process Piping," Normal Service category for low-pressure<br />

Air Purge piping and process condensate drain piping.<br />

2. Comply with ASME B31.3, as applicable, for materials, products, and installation.<br />

3. Safety Valves (if required): ASME Boiler and Pressure Vessel Code: Section VIII,<br />

Division 1. Safety valves shall bear the appropriate ASME label.<br />

4. Pressure Vessels (if required): ASME Boiler and Pressure Vessel Code: Section VIII,<br />

Division 1. Pressure vessels shall bear the appropriate ASME label.<br />

5. Flange set-up, alignment, bolt/stud installation and material requirements: comply with<br />

ASME PCC-1-2010.<br />

J. Steel Support Welding: Qualify processes and operators according to AWS D1.1/D1.1M,<br />

"Structural Welding Code - Steel."<br />

K. All piping, tubing and components indicated on the Drawings with a (Z) are Safety Significant<br />

SSCs (Structure Systems or Components).<br />

1. All safety SSCs will be procured, inspected, accepted, and verified in accordance with the<br />

requirements of PRC-MP-QA-599, Quality Assurance Program.<br />

2. The critical characteristics are:<br />

a. Pipe support spacing;<br />

b. Pipe wall thickness/schedule per ASTM;<br />

c. Pipe wall material type per ASTM;<br />

d. Support material type;<br />

e. Weld filler material; and<br />

f. Weld type.<br />

L. Testing Agency Qualifications: An independent testing agency, with the experience and<br />

capability to conduct the piping testing indicated, that is an NRTL as defined by OSHA in<br />

29 CFR 1910.7, and that is acceptable to the Buyer.<br />

M. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70,<br />

Article 100, by a testing agency acceptable to the Buyer, and marked for intended use.<br />

N. All items and processes are subject to review, inspection, or surveillance by the Buyer's Quality<br />

Assurance or Engineering Representatives at the Vendor's facility or the Vendor's subcontractor<br />

facility.<br />

O. Hold, Witness, and Verification points shall be identified in the Fabrication, Inspection and Test<br />

Plan. Prerequisites to verification points: Ensure that personnel have completed inspections and<br />

approved portions of work in accordance with specification requirements before notifying Buyer.<br />

P. Seller shall control fabrication, assembly, inspection, testing, and related activities, performed in<br />

shops and at worksite, in accordance with Fabrication, Inspecting and Test Plan.<br />