01.10.2013 Views

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sludge Treatment Project Engineered Container Retrieval and Transfer System January 2012<br />

1.6 PROJECT CONDITIONS<br />

A. Partial Owner Occupancy: Owner may occupy completed areas of building before Substantial<br />

Completion. Cooperate with Owner during TAB operations to minimize conflicts with Owner's<br />

operations.<br />

1.7 COORD<strong>IN</strong>ATION<br />

A. Coordinate the efforts of factory-authorized service representatives for systems and equipment,<br />

HVAC controls installers, and other mechanics to operate HVAC systems and equipment to<br />

support and assist TAB activities.<br />

B. Notice: Provide seven days' advance notice for each test. Include scheduled test dates and<br />

times.<br />

C. Perform TAB after leakage and pressure tests on air and water distribution systems have been<br />

satisfactorily completed.<br />

1.8 WARRANTY<br />

A. National Project Performance Guarantee: Provide a guarantee on AABC's "National Standards<br />

for Testing and Balancing Heating, Ventilating, and Air Conditioning Systems" forms stating<br />

that AABC will assist in completing requirements of the Contract Documents if TAB firm fails<br />

to comply with the Contract Documents. Guarantee includes the following provisions:<br />

1. The certified TAB firm has tested and balanced systems according to the Contract<br />

Documents.<br />

2. Systems are balanced to optimum performance capabilities within design and installation<br />

limits.<br />

B. Special Guarantee: Provide a guarantee on NEBB or TABB forms stating that NEBB or TABB<br />

will assist in completing requirements of the Contract Documents if TAB firm fails to comply<br />

with the Contract Documents. Guarantee shall include the following provisions:<br />

1. The certified TAB firm has tested and balanced systems according to the Contract<br />

Documents.<br />

2. Systems are balanced to optimum performance capabilities within design and installation<br />

limits.<br />

PART 2 - PRODUCTS (Not Applicable)<br />

PART 3 - EXECUTION<br />

3.1 EXAM<strong>IN</strong>ATION<br />

A. Examine the Contract Documents to become familiar with Project requirements and to discover<br />

conditions in systems' designs that may preclude proper TAB of systems and equipment.<br />

Contract 44577 KW Annex - Rev. E 44577-CSI-SPEC-001 230593 - 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!