Sludge Treatment Project Engineered Container Retrieval and Transfer System January 2012<br />

1. Traceability to Buyer Contract number.<br />

2. Description of items to fabricate/test/inspect.<br />

3. Sequential fabrication/process steps.<br />

4. Sequential points for inspection and tests to be performed during processing.<br />

5. Methods/procedures to be used for performance of inspection, test, and/or fabrication including:<br />

a. Method used to control material,<br />

b. Method used to control filler materials,<br />

c. Method used to verify the dimensional accuracy of the fabrication,<br />

d. Method used to segregate tools used on fabrication of stainless steel from tools<br />

used on carbon steel,<br />

e. Weld procedures used for production welding.<br />

6. Characteristic or attribute to be evaluated and acceptance criteria.<br />

7. Report form to use.<br />

8. Specific codes/standards requirements as specified by procurement documents.<br />

9. Sampling plan for final characteristics (e.g. Quality Level, Lot size, inspection level,<br />

etc.).<br />

10. Fabrication procedures to use to perform the work.<br />

11. Pneumatic Test Procedures.<br />

12. The Buyer may perform oversight of fabrication and inspections to verify compliance to<br />

requirements. Vendor shall notify the Buyer for verifications required in the Statement of<br />

Work and/or as identified in the fabrication inspection and test plan.<br />

B. Cleaning of piping: If manufacturer cleaned and capped fittings or piping are not available or if<br />

pre-cleaned fittings or tubing must be re-cleaned because of exposure, have supplier or separate<br />

agency acceptable to the Buyer.<br />

1. Clean piping and fittings, valves, gages, and other components of oil, grease, and other<br />

readily oxidizable materials.<br />

2. Wash piping spools and components in hot, alkaline-cleaner-water solution of sodium<br />

carbonate or trisodium phosphate in proportion of 1 lb (0.453 kg) of chemical to 3 gal.<br />

(11.3 L) of water.<br />

3. Scrub to ensure complete cleaning.<br />

4. Rinse with clean, hot water to remove cleaning solution.<br />

5. Prior to fit-up and welding, piping shall be visually checked for cleanliness. If examination<br />

reveals rust, loose mill scale, or foreign matter, pipes shall be blown out with dry,<br />

Contract 44577 KW Annex - Rev. E 44577-CSI-SPEC-001 226313 - 24