Sludge Treatment Project Engineered Container Retrieval and Transfer System January 2012<br />

1. Visually inspect duct system to ensure that no visible contaminants are present.<br />

2. Test sections of metal duct system, chosen randomly by Owner, for cleanliness according<br />

to "Vacuum Test" in NADCA ACR, "Assessment, Cleaning and Restoration of HVAC<br />

Systems."<br />

a. Acceptable Cleanliness Level: Net weight of debris collected on the filter media<br />

shall not exceed 0.75 mg/100 sq. cm.<br />

D. Duct system will be considered defective if it does not pass tests and inspections.<br />

E. Prepare test and inspection reports.<br />

3.8 TEST<strong>IN</strong>G AND <strong>IN</strong>SPECTION - EXHAUST DUCTWORK<br />

A. Perform acceptance tests on the process area exhaust ductwork in accordance with ASME AG-<br />

1, Table TA-4310.<br />

B. Visual Inspection: Inspect ductwork, supports, and housings in accordance with ASME AG-1<br />

Section SA-5200 and TA-4320. Submit a visual inspection report.<br />

C. HEPA filter Frame Inspection: Inspect HEPA filter frames in accordance with ASME AG-1<br />

Section FG-5000. Submit HEPA filter frame inspection reports.<br />

D. Structural Capability Tests: Perform a Structural capability test of the ductwork in accordance<br />

with ASME AG-1 Section SA-5400 and Section TA-4331 at pressures indicated in the “Duct<br />

Pressure Classification”. The CONTRACTOR shall conduct tests that will be witnessed by the<br />

BUYER prior to delivery to the work site. Also, a test of the completed exhaust system shall be<br />

conducted by the CONTRACTOR following installation of the ducting covered in this<br />

performance specification. Submit structural capability test procedure and report for the both<br />

tests.<br />

E. Leakage Tests: Comply with ASME AG-1 Section SA-5300 and Table SA-B-1310, Class I,<br />

ESF systems and Section TA-4332. The CONTRACTOR shall conduct tests that will be<br />

witnessed by the BUYER prior to delivery to the work site. Also, a test of the complete exhaust<br />

system shall be conducted by the CONTRACTOR following installation of the ducting covered<br />

in this performance specification. Submit leakage test procedures and report for the both tests.<br />

F. Test the following systems:<br />

G. Exhaust Ducts: Test all duct sections prior to delivery.<br />

H. Process Exhaust system: Test all duct sections, including HEPA filter housings up to the inlet<br />

of the exhaust fans after installation.<br />

I. Conduct tests at static pressures equal to Leak test pressure of system or section being tested.<br />

Do not pressurize systems above maximum design operating pressure.<br />

J. Duct system will be considered defective if it does not pass tests and inspections. Prepare and<br />

submit test and inspection reports.<br />

Contract 44577 KW Annex - Rev. E 44577-CSI-SPEC-001 233113 - 12