SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Sludge Treatment Project Engineered Container Retrieval and Transfer System December 2011<br />

2. Final Acceptance Test<br />

a. Proposed procedures for Final Acceptance Test, and notification of proposed test<br />

date, shall be provided no later than 20 days prior to the proposed start of the<br />

tests. The Fire Marshal’s Office shall be provided the opportunity to observe<br />

the tests. Notification shall include a copy of the Contractor's Material & Test<br />

Certificates.<br />

b. Three copies of the completed Final Acceptance Tests Reports, no later than 7 days<br />

after the completion of the Final Acceptance Tests. All items in the Final<br />

Acceptance Report shall be stamped and signed by the Fire Protection<br />

Specialist.<br />

E. Certificates. Concurrent with the Final Acceptance Test Report, certification by the Fire<br />

Protection Specialist that the sprinkler system is installed in accordance with the contract<br />

requirements, including signed approval of the Preliminary and Final Acceptance Test<br />

Reports.<br />

F. Operation and Maintenance Instructions. Six manuals listing step-by-step procedures required<br />

for system startup, operation, shutdown, and routine maintenance, at least 20 days prior to<br />

field training. The manuals shall include the manufacturer's name, model number, parts list,<br />

list of parts and tools that should be kept in stock by the owner for routine maintenance<br />

including the name of a local supplier, simplified wiring and controls diagrams,<br />

troubleshooting guide, and recommended service organization (including address and<br />

telephone number) for each item of equipment.<br />

1.4 QUALITY ASSURANCE<br />

A. Work identified in this section shall be done under a Quality Assurance program in accordance<br />

with ASME NQA-1, as approved by the Owner and described in Section 014000, Quality<br />

Assurance and Control Requirements Specification – Fabrication, or Section 014001,<br />

Quality Assurance and Control Requirements Specification – Construction.<br />

B. The highest functional classification for the scope of this Specification section is PC-2 for items<br />

and services classified as safety significant.<br />

C. Compliance with referenced NFPA standards is mandatory. This includes advisory provisions<br />

listed in the appendices of such standards, as though the word "shall" had been substituted<br />

for the word "should" wherever it appears. In the event of a conflict between specific<br />

provisions of this specification and applicable NFPA standards, this specification shall<br />

govern. Reference to "authority having jurisdiction" shall be interpreted to mean the<br />

Hanford Fire Marshal.<br />

D. Quality levels are defined on the associated line lists, valve lists and datasheets accompanying<br />

this section.<br />

1.5 EXTRA MATERIALS<br />

Furnish extra materials described below that match products installed and that are packaged with protective<br />

covering for storage and identified with labels describing contents.<br />

Contract 44577 KW Annex - Rev. D 44577-CSI-SPEC-001 211313 - 5