Sludge Treatment Project Engineered Container Retrieval and Transfer System December 2011<br />

C. Compact soil materials to not less than the following percentages of maximum dry unit weight<br />

according to ASTM D 1557:<br />

1. Under structures, and pavements, compact top 12 inches of existing subgrade and each<br />

layer of backfill or fill soil material at 92 percent.<br />

2. Under building slabs, walkways and steps, compact top 12 inches of existing subgrade<br />

and each layer of backfill or fill soil material at 95 percent.<br />

3. Under unpaved areas, compact top six (6) inches below subgrade and compact each layer<br />

of backfill or fill soil material at 85 percent.<br />

4. For utility trenches not under structures or pavement, compact each layer of backfill soil<br />

material at 85 percent.<br />

3.13 GRAD<strong>IN</strong>G<br />

A. General: Uniformly grade areas to be free of irregular surface changes. Comply with<br />

compaction requirements and grade to cross sections, lines, and elevations indicated.<br />

B. Site Rough Grading: Slope grades to direct water away from buildings and to prevent<br />

unintended ponding. Finish subgrades to required elevations within the following tolerances:<br />

1. Unpaved Areas: Plus or minus one (1) inch.<br />

2. Walks: Plus or minus 1/2 inch.<br />

3. Pavements: Plus or minus 1/2 inch.<br />

C. Grading inside Building Lines: Finish subgrade to a tolerance of 1/2 inch when tested with a 10<br />

foot straightedge. Over excavation and trimming out excavations with gravel is anticipated.<br />

3.14 BASE COURSES UNDER PAVEMENTS AND WALKS<br />

A. Place base course on subgrades free of mud, frost, snow, or ice.<br />

B. On prepared subgrade, place base course under pavements and walks as follows:<br />

1. Shape base course to required crown elevations and cross-slope grades.<br />

2. Place base course that exceeds six (6) inches in compacted thickness in layers of equal<br />

thickness, with no compacted layer more than six (6) inches thick or less than three (3)<br />

inches thick.<br />

3. Compact imported subgrade and base course to not less than 95 percent of maximum dry<br />

unit weight according to ASTM D1557. Material should be within two (2) percent of<br />

optimum moisture content during compaction.<br />

3.15 DRA<strong>IN</strong>AGE COURSE UNDER <strong>CONCRETE</strong> SLABS-ON-GRADE<br />

A. Place drainage course on subgrades free of mud, frost, snow, or ice.<br />

B. On prepared subgrade, place and compact drainage course under cast-in-place concrete slabson-grade<br />

as follows:<br />

Contract 44577 KW Annex - Rev. D 44577-CSI-SPEC-001 312000 - 7