Sludge Treatment Project Engineered Container Retrieval and Transfer System January 2012<br />

9. Sampling plan for final characteristics (e.g. Quality Level, Lot size, inspection level,<br />

etc.).<br />

10. Fabrication procedures to use to perform the work.<br />

11. Hydrostatic and Pneumatic Test Procedures.<br />

12. The Buyer may perform oversight of fabrication and inspections to verify compliance to<br />

requirements. Vendor shall notify the Buyer for verifications required in the Statement of<br />

Work and/or as identified in the fabrication inspection and test plan.<br />

B. Cleaning of piping: If manufacturer cleaned and capped fittings or piping are not available or if<br />

pre-cleaned fittings or tubing must be re-cleaned because of exposure, have supplier or separate<br />

agency acceptable to the Buyer.<br />

1. Clean piping and fittings, valves, gages, and other components of oil, grease, and other<br />

readily oxidizable materials.<br />

2. Wash piping spools and components in hot, alkaline-cleaner-water solution of sodium<br />

carbonate or trisodium phosphate in proportion of 1 lb (0.453 kg) of chemical to 3 gal.<br />

(11.3 L) of water.<br />

3. Scrub to ensure complete cleaning.<br />

4. Rinse with clean, hot water to remove cleaning solution.<br />

5. Prior to fit-up and welding, piping shall be visually checked for cleanliness. If examination<br />

reveals rust, loose mill scale, or foreign matter, pipes shall be blown out with dry,<br />

oil-free air or nitrogen before placing in position. If foreign material appears to be lodged<br />

in the pipe, it shall be removed by running fish tape, cable, or chain through the pipe.<br />

6. After NDE is complete and before connecting system into existing systems, clean piping<br />

internal surfaces mechanically or by water flushing.<br />

7. Flush piping with potable water until effluent is clean and contains no visible particulate<br />

matter. Flushing pressure shall not exceed the design pressure specified in pipe class.<br />

Flushing water supply shall have sufficient capacity to produce a flow velocity of 4 to 6<br />

ft/s in largest pipe size, with pipe full. Provide flow measurement in flushing water<br />

supply line to be used as basis for verification of velocities in piping system.<br />

8. Cleaning materials for stainless steel shall meet the requirements of Section 3.1.C.<br />

9. Cleaning materials shall be controlled and documented in accordance with the Seller's fabrication,<br />

inspection and test plan as approved by the Buyer.<br />

10. Provide documented evidence that water flushing or mechanical cleaning has been accomplished<br />

as specified in this section.<br />

11. After cleaning and water flushing, remove all water and blowout lines with clean oil free<br />

air and cap the lines with chloride free plastic caps or reconnect to the system.<br />

Contract 44577 KW Annex – Rev. E 44577-CSI-SPEC-001 221513 - 23