01.10.2013 Views

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sludge Treatment Project Engineered Container Retrieval and Transfer System January 2012<br />

PART 2 - PRODUCTS<br />

2.1 PRODUCT OPTIONS AND SUBSTITUTIONS<br />

A. Alternate products may be accepted; follow Section 012513, Product Substitution Procedures.<br />

2.2 FABRICATED METAL EXHAUST STACK<br />

A. The building exhaust stack is freestanding and without access ladder and platform. See<br />

Drawings for elevation, diameter, sample port locations and breech information.<br />

B. Fabricate stack, stack breaching, and stack base from Type 304 or 304L stainless steel sheet or<br />

plate, meeting the requirements of ASTM A 240/ A 240M.<br />

1. Equal to or Less Than 16 Inches in Diameter: 0.125 inch.<br />

2. Larger Than 16 inches in Diameter: 0.1875 inch.<br />

C. Fabricate stack reinforcement and flanged connections from stainless steel bars, and shapes<br />

Type 304 or 304L, meeting the requirements of ASTM A 276.<br />

D. Fasteners for the primary stack connections shall meet the requirements of ASTM A 193, nuts<br />

shall meet the requirements of ASTM A 194, washers shall be 300 series stainless steel.<br />

E. Stack shall have a false bottom for the collection of rain water. False bottom can be flat plate or<br />

elliptical head type with a low point drain. Drain pipe will be routed so that it is accessible from<br />

the outside of the stack structure. Drain connection will be 1 inch schedule 40 NPT threaded<br />

with pipe material compatible with stack.<br />

F. Nozzles shall be Type 304 or 304L minimum schedule 10S pipe meeting the requirements of<br />

ASTM A 312 with Class 150 slip-on flanges meeting the requirements of ASTM A 182/A<br />

182M.<br />

G. Design, fabricate, and inspect stack in accordance with SMACNA “Guide for Steel Stack<br />

Construction” and ASME STS-1. Where there are conflicts, ASME STS-1 shall govern.<br />

1. Seismic and wind loading: In accordance with Section 230548, Section Vibration and<br />

Seismic Controls for HVAC, Piping, and Equipment.<br />

PART 3 - EXECUTION<br />

3.1 EXAM<strong>IN</strong>ATION<br />

A. Examine areas and conditions for compliance with requirements.<br />

3.2 CLEAN<strong>IN</strong>G<br />

A. After completing fabrication, remove burrs, dirt, and construction debris.<br />

Contract 44577 KW Annex - Rev. E 44577-CSI-SPEC-001 235100 - 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!