Sludge Treatment Project Engineered Container Retrieval and Transfer System January 2012<br />

B. Install piping adjacent to compressed air equipment to allow service and maintenance.<br />

3.4 IDENTIFICATION<br />

A. Identify general-service air compressors and components. Comply with requirements for<br />

identification specified in Section 220553, "Identification for Plumbing Piping and Equipment."<br />

3.5 STARTUP SERVICE<br />

A. Engage a factory-authorized service representative to perform startup service.<br />

1. Complete installation and startup checks according to manufacturer's written instructions.<br />

2. Check for lubricating oil in lubricated-type equipment.<br />

3. Check belt drives (if applicable) for proper tension.<br />

4. Verify that air-compressor inlet filters and piping are clear.<br />

5. Check for equipment vibration-control supports and flexible pipe connectors and verify<br />

that equipment is properly attached to substrate.<br />

6. Check safety valves for correct settings. Ensure that settings are higher than aircompressor<br />

discharge pressure but not higher than rating of system components.<br />

7. Check for proper seismic restraints (if applicable).<br />

8. Drain condensate from air compressor wet receiver, air dryer and receiver tanks.<br />

9. Operational Test: After electrical circuitry has been energized, start units to confirm<br />

proper motor rotation and unit operation.<br />

10. Test and adjust controls and safeties.<br />

3.6 DEMONSTRATION<br />

A. Engage factory-authorized service representative to train Buyer's maintenance personnel to<br />

adjust, operate, and maintain the air compressor, after coolers, air dryers, air receivers and<br />

associated equipment.<br />

END OF <strong>SECTION</strong> 221519<br />

Contract 44577 KW Annex – Rev. E 44577-CSI-SPEC-001 221519 - 13