Sludge Treatment Project Engineered Container Retrieval and Transfer System January 2012<br />

6. NPS 1-1/2: 10 feet with 3/8-inch rod.<br />

7. NPS 2: 11 feet with 3/8-inch rod.<br />

I. Install supports for vertical piping every 10 feet.<br />

3.6 FASTENERS<br />

A. Graded fasteners shall be carefully controlled as defined in Section 014000, Quality Assurance<br />

and Control, as applicable.<br />

B. Seller shall establish the bolt torque requirements for all bolted structural connections in accordance<br />

with Section 055000, Metal Fabrications.<br />

C. Flange bolt torque values shall be per gasket manufacturer recommendation not to exceed 75%<br />

of bolt allowable yield strength as defined in the applicable ASTM standard and using appropriate<br />

bolt torque patterns as shown in ASME PCC-1-2010, Appendix F.<br />

3.7 LABEL<strong>IN</strong>G AND IDENTIFICATION<br />

A. Install identifying labels and devices for piping, valves, and specialties. Label piping system in<br />

accordance with Section 220553, Identification for Plumbing Piping and Equipment.<br />

3.8 FIELD QUALITY CONTROL<br />

A. Testing Agency: Buyer will engage qualified testing agency to perform field tests and<br />

inspections of piping and prepare test reports.<br />

B. Perform field tests and inspections of piping and prepare test reports.<br />

C. Tests and Inspections:<br />

1. Piping Testing Coordination: Perform tests, inspections, verifications, and certification<br />

of piping systems concurrently with tests, inspections, and certification of interfacing<br />

systems.<br />

2. Inspect Pressure or flow regulators for proper operation.<br />

3. Preparation: Perform the following Installer tests:<br />

a. Initial blow down.<br />

b. Initial pressure test.<br />

c. Standing pressure test for positive pressure piping.<br />