Sludge Treatment Project Engineered Container Retrieval and Transfer System January 2012<br />

I. ACI Publications: Comply with the following unless modified by requirements in the Contract<br />

Documents:<br />

1. ACI 301, “Specifications for Structural Concrete”, Sections 1 through 5 and Section 7,<br />

“Lightweight Concrete”.<br />

2. ACI 117, “Specifications for Tolerances for Concrete Construction and Materials”.<br />

3. ACI 211.1, “Standard Practice for Selecting Proportions for Normal, Heavyweight, and<br />

Mass Concrete”.<br />

4. ACI 211.2, “Standard Practice for Selecting Proportions for Structural Lightweight<br />

Concrete”.<br />

5. ACI 305R, “Hot Weather Concreting”.<br />

6. ACI 306R, “Cold Weather Concreting”.<br />

J. Concrete Testing Service: Engage a qualified independent testing agency to perform material<br />

evaluation tests and to design concrete mixtures.<br />

K. Mockups: Cast structural lightweight concrete mixture on metal deck to demonstrate surface<br />

finish, texture, tolerances, unit weight, compressive strength, delivery time, conveying and<br />

standard of workmanship.<br />

1. Build panel approximately 100 sq. ft. in the location near indicated by Buyer’s Technical<br />

Representative. Deck shall have supports at 5’ centers and be at least two spans. Metal<br />

deck shall be same used for roofing. Deck need not be anchored to the supports.<br />

2. Mockup may be near ground level but shall be conveyed as will be done for roof decks.<br />

3. Mockup may be removed after approval including 28 day test reports.<br />

L. Preinstallation Conference: Conduct conference at Project site.<br />

1. Before submitting design mixtures, review concrete design mixture and examine<br />

procedures for ensuring quality of concrete materials. Require representatives of each<br />

entity directly concerned with cast-in-place concrete to attend, including the following:<br />

a. Contractor's superintendent.<br />

b. Independent testing agency responsible for concrete design mixtures.<br />

c. Ready-mix concrete manufacturer.<br />

d. Concrete subcontractor.<br />

2. Coordinate meeting. Request the following representatives to attend:<br />

a. BTR<br />

b. CHPRC Construction Manager.<br />

c. CHPRC QC.<br />

d. Structural Engineer.<br />

3. Review special inspection and testing and inspecting agency procedures for field quality<br />

control, concrete finishes and finishing, cold and hot-weather concreting procedures, fall<br />

protection, lifts, critical lifts, curing procedures, construction contraction and isolation<br />

joints, and joint-filler strips, forms and form removal limitations, shoring and reshoring<br />

procedures, vapor-retarder installation, anchor rod and anchorage device installation<br />

Contract 44577 KW Annex - Rev. E 44577-CSI-SPEC-001 <strong>033000</strong> - 5