Sludge Treatment Project Engineered Container Retrieval and Transfer System January 2012<br />

D. Operation and Maintenance Data: For compressed-air equipment to include off normal, normal<br />

operation, and maintenance manuals.<br />

1.4 QUALITY ASSURANCE<br />

A. Work identified in this section shall be done under a Quality Assurance program in accordance<br />

with ASME NQA-1, as approved by the Owner and described in Section 014000, Quality<br />

Assurance and Control.<br />

B. The highest functional classification for the scope of this Specification section is classified as<br />

General Service.<br />

C. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70,<br />

by a qualified testing agency, and marked for intended location and application.<br />

D. ASME Compliance: Fabricate and label air compressor coolant tank, air receivers and air dryer<br />

towers to comply with ASME Boiler and Pressure Vessel Code, Section VIII, Division 1.<br />

Submit ASME U1 Data reports for each vessel.<br />

E. The assembled units and optional equipment shall be factory tested prior to shipment.<br />

1.5 DEF<strong>IN</strong>ITIONS<br />

A. Refer to Section 011100, Summary of Work, for definition of general requirements that apply to<br />

all specification sections prepared for this Project.<br />

B. Specific definition applicable to this section include:<br />

1. Actual Air: Air supplied or delivered from air compressors. Flow rate is compressed air<br />

measured in acfm.<br />

2. Low Voltage: As defined in NFPA 70 for circuits and equipment operating at less than<br />

50 V or for remote-control, signaling power-limited circuits.<br />

3. Standard Air: Free air at 68 deg F and 1 atmosphere (14.696 psia) before compression or<br />

expansion and measured in scfm.<br />

4. Buyer: the contractor responsible for managing the design, procurement, and construction<br />

of the K-West Basin Modification Annex Project.<br />

5. Seller: Contracted fabricator, Seller, or subcontractor performing work to the contract<br />

drawings, data sheets, and technical specifications.<br />

6. Certificate of Conformance: A document signed or otherwise authenticated by an<br />

authorized individual certifying the degree to which items or services meet specified<br />

requirements.<br />

7. MSDS: Material Safety Data Sheet<br />

1.6 PERFORMANCE REQUIREMENTS<br />

A. Delegated Design: Design compressed-air equipment mounting, including comprehensive<br />

engineering analysis by a qualified professional engineer, using performance requirements and<br />

design criteria indicated.<br />

Contract 44577 KW Annex – Rev. E 44577-CSI-SPEC-001 221519 - 2