Sludge Treatment Project Engineered Container Retrieval and Transfer System December 2011<br />

2. Portable Feed-Through Accessory: Two-terminal, dead-front junction arranged for<br />

removable mounting on accessory stand of stationary terminal junction.<br />

3. Grounding Kit: Jumpered elbows, portable feed-through accessory units, protective caps,<br />

test rods suitable for concurrently grounding three phases of feeders, and carrying case.<br />

4. Standoff Insulator: Portable, single dead-front terminal for removable mounting on<br />

accessory stand of stationary terminal junction. Insulators suitable for fully insulated<br />

isolation of energized cable-elbow terminator.<br />

E. Tool Set: Shotgun hot stick with energized terminal indicator, fault-indicator test tool, and<br />

carrying case.<br />

2.5 SOURCE QUALITY CONTROL<br />

A. Test and inspect cables before shipping.<br />

B. Test strand-filled cables for water-penetration resistance according to ICEA T-31-610, using a<br />

test pressure of 5 psig.<br />

PART 3 - EXECUTION<br />

3.1 <strong>IN</strong>STALLATION<br />

A. Install cables according to IEEE 576.<br />

B. Pull Conductors: Do not exceed manufacturer's recommended maximum pulling tensions and<br />

sidewall pressure values.<br />

1. Where necessary, use manufacturer-approved pulling compound or lubricant that will not<br />

deteriorate conductor or insulation.<br />

2. Use pulling means, including fish tape, cable, rope, and basket-weave cable grips that<br />

will not damage cables and raceways. Do not use rope hitches for pulling attachment to<br />

cable.<br />

C. Install exposed cables parallel and perpendicular to surfaces of exposed structural members and<br />

follow surface contours where possible.<br />

D. Support cables according to Division 26 Section "Common Work Results for Electrical."<br />

E. Install "buried-cable" warning tape 12 inches above cables.<br />

F. Install terminations at ends of conductors and seal multiconductor cable ends with standard kits.<br />

G. Install separable insulated-connector components as follows:<br />

1. Protective Cap: At each terminal junction, with one on each terminal to which no feeder<br />

is indicated to be connected.<br />

2. Portable Feed-Through Accessory: Three.<br />

3. Standoff Insulator: Three.<br />

Contract 44577 KW Annex – Rev. D 44577-CSI-SPEC-001 260513-4