01.10.2013 Views

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sludge Treatment Project Engineered Container Retrieval and Transfer System January 2012<br />

f. Safety valve settings in psig.<br />

g. High-limit setting in psig.<br />

h. Operating-control setting.<br />

i. Voltage at each connection.<br />

j. Amperage for each phase.<br />

M. Vibration Measurement Reports:<br />

1. Date and time of test.<br />

2. Vibration meter manufacturer, model number, and serial number.<br />

3. Equipment designation, location, equipment, speed, motor speed, and motor horsepower.<br />

4. Diagram of equipment showing the vibration measurement locations.<br />

5. Measurement readings for each measurement location.<br />

6. Calculate isolator efficiency using measurements taken.<br />

7. Description of predominant vibration source.<br />

N. Instrument Calibration Reports:<br />

1. Report Data:<br />

3.21 <strong>IN</strong>SPECTIONS<br />

A. Initial Inspection:<br />

a. Instrument type and make.<br />

b. Serial number.<br />

c. Application.<br />

d. Dates of use.<br />

e. Dates of calibration.<br />

1. After testing and balancing are complete, operate each system and randomly check<br />

measurements to verify that the system is operating according to the final test and balance<br />

readings documented in the Final Report.<br />

2. Randomly check the following for each system:<br />

B. Final Inspection:<br />

a. Measure airflow of at least 10 percent of air outlets.<br />

b. Measure room temperature at each thermostat/temperature sensor. Compare the<br />

reading to the set point.<br />

c. Measure space pressure of Sludge loadout bay.<br />

d. Verify that balancing devices are marked with final balance position.<br />

e. Note deviations to the Contract Documents in the Final Report.<br />

1. After initial inspection is complete and evidence by random checks verifies that testing<br />

and balancing are complete and accurately documented in the final report, request that a<br />

final inspection be made by Owner.<br />

2. TAB firm test and balance engineer shall conduct the inspection in the presence of<br />

Owner.<br />

Contract 44577 KW Annex - Rev. E 44577-CSI-SPEC-001 230593 - 21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!