Sludge Treatment Project Engineered Container Retrieval and Transfer System January 2012<br />

3.2 ADJUST<strong>IN</strong>G AND CLEAN<strong>IN</strong>G<br />

A. Touchup Painting: Immediately after erection, clean field welds, bolted connections, and<br />

abraded areas of shop paint, and paint exposed areas with the same material as used for shop<br />

painting to comply with SSPC-PA 1 for touching up shop-painted surfaces.<br />

3.3 FIELD QUALITY CONTROL<br />

A. Testing Agency: Engage a qualified independent testing and inspecting agency to inspect post<br />

installed anchors.<br />

B. Anchor and anchor installation shall conform to ICC report.<br />

C. Testing agency will report inspection results promptly and in writing to Contractor and<br />

Architect.<br />

D. Correct deficiencies in Work that test reports and inspections indicate does not comply with the<br />

Contract Documents.<br />

END OF <strong>SECTION</strong> 055213<br />

Contract 44577 KW Annex - Rev. E 44577-CSI-SPEC-001 055213 - 4