01.10.2013 Views

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sludge Treatment Project Engineered Container Retrieval and Transfer System January 2012<br />

16. WQ&I: Welder Qualification and Inspection<br />

1.6 PERFORMANCE REQUIREMENTS<br />

A. General Design Requirements and Conditions for the IXM Distribution piping system:<br />

1. Normal operating pressure at 100 psig, maximum.<br />

2. Normal design pressure of 125 psig.<br />

3. Normal operating temperature at 68 deg F.<br />

4. Normal design temperature at 100 deg F.<br />

5. Normal operating flow rate at 70 gpm, maximum.<br />

6. Fluid properties are the same as deionized water at 68 deg F.<br />

7. Piping Code: ASME B31.3, Normal Service category.<br />

B. Manufacturer Seismic Qualification Certification: Submit certification that IXM Distribution<br />

piping, accessories, and components will withstand seismic forces defined in Section 220548,<br />

Vibration and Seismic Controls for Plumbing Piping and Equipment. Include the following:<br />

1. The term "withstand" means "the unit will remain in place without separation of any parts<br />

from the device when subjected to the seismic forces specified."<br />

2. Basis for Certification: Indicate whether withstand certification is based on actual test of<br />

assembled components or on calculation.<br />

3. All pipe installation isometrics and vendor specific data necessary for pipe stress analysis<br />

(including flange leakage analysis data) shall be supplied by the Seller to the Buyer for<br />

review 30 days prior to scheduled installation date.<br />

1.7 PROJECT CONDITIONS<br />

A. Interruption of Existing IXM Service(s): Do not interrupt IXM water service to facilities<br />

occupied by Buyer or others unless permitted under the following conditions and then only after<br />

arranging to provide temporary service according to requirements indicated:<br />

1. Notify Buyer no fewer than two days in advance of proposed interruption of IXM water<br />

distribution service(s).<br />

2. Do not proceed with interruption of IXM water distribution service(s) without Buyer's<br />

written permission.<br />

Contract 44577 KW Annex – Rev E. 44577-CSI-SPEC-001 402319-8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!