01.10.2013 Views

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sludge Treatment Project Engineered Container Retrieval and Transfer System January 2012<br />

piping in accordance with ASME B31.3, "Process Piping" Section 345.4<br />

hydrostatic leak test.<br />

e. After hydrostatic test pressure has been applied for at least 10 minutes, examine<br />

piping, joints, and connections for leakage. Eliminate leaks by tightening,<br />

repairing, or replacing components, and repeat hydrostatic test until there are no<br />

leaks.<br />

f. Prepare written report of testing.<br />

5. System Verification; perform the following tests and inspections:<br />

a. Valve test.<br />

b. Final tie-in test.<br />

c. Operational pressure test.<br />

d. Verify correct labeling of equipment and components.<br />

6. Testing Certification: Certify that specified tests, inspections, and procedures have been<br />

performed and certify report results. Include the following:<br />

a. Inspections performed.<br />

b. Test methods used.<br />

c. Results of tests.<br />

D. Remove and replace components that do not pass tests and inspections and retest as specified<br />

above.<br />

Contract 44577 KW Annex – Rev E. 44577-CSI-SPEC-001 402319-26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!