SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sludge Treatment Project Engineered Container Retrieval and Transfer System January 2012<br />

3.7 CLEAN<strong>IN</strong>G<br />

A. After completing system installation and testing, adjusting, and balancing air-handling unit and<br />

air-distribution systems and after completing startup service, clean air-handling units internally<br />

to remove foreign material and construction dirt and dust. Clean fan wheels, cabinets, dampers,<br />

coils, and filter housings, and install new, clean filters.<br />

3.8 DEMONSTRATION<br />

A. Engage a factory-authorized service representative to train Owner's maintenance personnel to<br />

adjust, operate, and maintain air-handling units.<br />

END OF <strong>SECTION</strong> 237313<br />

Contract 44577 KW Annex - Rev. E 44577-CSI-SPEC-001 237313 - 16