Sludge Treatment Project Engineered Container Retrieval and Transfer System January 2012<br />

ner as to produce a uniform smoothness. Special attention shall be paid to crevices, weld lines,<br />

carriers, and edges to obtain the required thickness.<br />

PART 3 - EXECUTION<br />

3.1 EXAM<strong>IN</strong>ATION<br />

A. Before air compressor, air dryer or air receiver installation, examine roughing-in for equipment<br />

support, anchor-bolt sizes and locations, piping, and electrical connections to verify actual<br />

locations, sizes, and other conditions affecting air compressor equipment performance,<br />

maintenance, and operations.<br />

1. Air compressor equipment locations indicated on Drawings are approximate. Determine<br />

exact locations before roughing-in for piping and electrical connections.<br />

B. Proceed with installation only after unsatisfactory conditions have been corrected.<br />

3.2 EQUIPMENT <strong>IN</strong>STALLATION<br />

A. Equipment Mounting: Install air compressor package and air dryer skid on concrete substrate<br />

using elastomeric pads and anchor bolting. Install air receiver tanks directly to concrete<br />

substrate with anchor bolting. Comply with requirements specified in Section 220548, Vibration<br />

and Seismic Controls for Plumbing Piping and Equipment.<br />

1. Minimum Deflection: 1/4 inch (as applicable when using vibration dampening pads).<br />

2. For supported equipment, install anchor bolts that anchor into the structural concrete<br />

floor.<br />

3. Place and secure anchorage devices. Use setting drawings, templates, diagrams,<br />

instructions, and directions furnished with items to be embedded.<br />

4. Install anchor bolts to elevations required for proper attachment to supported equipment.<br />

B. Arrange equipment so controls and devices are accessible for servicing.<br />

C. Maintain manufacturer's recommended clearances for service and maintenance.<br />

D. Install the following devices on compressed-air equipment:<br />

1. Filters, Thermometers, Pressure Gages, and Safety Valves: Install manufacturers<br />

supplied equipment, shipped separately, on compressed-air system equipment.<br />

2. Automatic Drain Valves: Install on after coolers, receivers, and dryers. Discharge<br />

condensate over nearest floor drain using elastomeric hoses.<br />

3.3 CONNECTIONS<br />

A. Comply with requirements for piping specified in Section 221513, "General Service<br />

Compressed Air Piping." Drawings indicate general arrangement of piping, fittings, and<br />

specialties.<br />

Contract 44577 KW Annex – Rev. E 44577-CSI-SPEC-001 221519 - 12