01.10.2013 Views

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Sludge Treatment Project Engineered Container Retrieval and Transfer System January 2012<br />

5. Calibration records and list of set points.<br />

1.6 QUALITY ASSURANCE<br />

A. Installer Qualifications: Automatic control system manufacturer's authorized representative<br />

who is trained and approved for installation of system components required for this Project.<br />

B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70,<br />

Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for<br />

intended use.<br />

C. Comply with ASHRAE 135 for DDC system components.<br />

1.7 DELIVERY, STORAGE, AND HANDL<strong>IN</strong>G<br />

A. Factory-Mounted Components: Where control devices specified in this Section are indicated to<br />

be factory mounted on equipment, arrange for shipping of control devices to equipment<br />

manufacturer.<br />

B. System Software: Update to latest version of software at Project completion.<br />

1.8 COORD<strong>IN</strong>ATION<br />

A. Coordinate location of thermostats and other exposed control sensors with plans and room<br />

details before installation.<br />

B. Coordinate equipment with Division 28 Section "Fire Detection and Alarm" to achieve<br />

compatibility with equipment that interfaces with that system.<br />

C. Coordinate supply of conditioned electrical branch circuits for control units and operator<br />

workstation.<br />

D. Coordinate equipment with Division 26 Section "Panelboards" to achieve compatibility with<br />

starter coils and annunciation devices.<br />

E. Coordinate equipment with Division 26 Section "Enclosed Controllers" to achieve compatibility<br />

with motor starters and annunciation devices.<br />

F. Coordinate equipment with Division 26 Section "Variable-Frequency Motor Controllers" to<br />

achieve compatibility with motor starters and annunciation devices.<br />

1.9 EXTRA MATERIALS<br />

A. Furnish extra materials described below that match products installed and that are packaged<br />

with protective covering for storage and identified with labels describing contents.<br />

1. Maintenance Materials: One thermostat adjusting key.<br />

Contract 44577 KW Annex - Rev. E 44577-CSI-SPEC-001 230900 - 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!