Sludge Treatment Project Engineered Container Retrieval and Transfer System January 2012<br />

2. Inspect pumps for proper rotation.<br />

3. Inspect air vents at high points of system and determine if all are installed and operating<br />

freely (automatic type), or bleed air completely (manual type).<br />

4. Set temperature controls so all coils are calling for full flow.<br />

5. Inspect and set operating temperatures of hydronic equipment, such as boilers, chillers,<br />

cooling towers, to specified values.<br />

6. Verify lubrication of motors and bearings.<br />

D. Backfill:<br />

1. A 4-inch layer of sand or fine gravel shall be placed and tamped in the trench to provide a<br />

uniform bedding for the pipe.<br />

2. Immediately after piping is installed in trench, a partial backfill shall be provided in<br />

middle of each unit leaving joints exposed for inspection before hydrostatic tests. After<br />

all thrust blocks are installed, a hydrostatic test shall be performed.<br />

3. After hydrostatic testing, final backfill of selected earth shall be hand-packed and handtamped<br />

to 6" minimum over top of jacket. Remainder of backfill shall be free of large<br />

boulders, rocks over 6" in diameter, frozen earth, or foreign matter. Do not furnish<br />

wheeled or tracked vehicles for tamping of backfill.<br />

E. Cleanup<br />

1. Remove rubbish, debris and waste materials and legally dispose off of the Project site.<br />

Contract 44577 KW Annex – Rev. E 44577-CSI-SPEC-001 232113 - 14