Sludge Treatment Project Engineered Container Retrieval and Transfer System December 2011<br />

1. Clearance: 12 inches each side of pipe or conduit or as indicated.<br />

C. Trench Bottoms: Excavate and shape trench bottoms to be uniform and even. Remove<br />

projecting stones and sharp objects along trench subgrade. Allow for pipe bedding as indicated.<br />

1. Excavate trenches six (6) inches deeper than elevation required to allow for bedding<br />

course.<br />

3.6 SUBGRADE <strong>IN</strong>SPECTION<br />

A. Proof-roll subgrade below the building slabs and pavements to identify soft pockets and areas of<br />

excess yielding. Do not proof-roll when subgrade is wet or saturated.<br />

B. Reconstruct subgrades damaged by freezing temperatures, frost, rain, accumulated water, or<br />

construction activities, as directed by Buyer’s Technical Representative, without additional<br />

compensation.<br />

C. Test or inspect subgrade materials as required for compaction requirements as applicable.<br />

3.7 UNAUTHORIZED EXCAVATION<br />

A. Fill unauthorized excavation under foundations or wall footings by extending bottom elevation<br />

of concrete foundation or footing to excavation bottom, without altering top elevation.<br />

Concrete fill, with 28 day compressive strength of 2,500 psi, may be used when approved by<br />

Buyer’s Technical Representative.<br />

1. Fill unauthorized excavations under other construction, pipe, or conduit Controlled<br />

Density Fill and as approved by the Buyer’s Technical Representative.<br />

3.8 STORAGE OF SOIL MATERIALS<br />

A. Stockpile borrow soil materials and excavated soil materials without intermixing. Place, grade,<br />

and shape stockpiles to drain surface water. Cover to prevent windblown dust.<br />

1. Stockpile soil materials at least 2 feet away from edge of excavations.<br />

3.9 UTILITY TRENCH BACKFILL<br />

A. Place backfill on subgrades free of mud, frost, snow, or ice.<br />

B. Place and compact bedding course on trench bottoms. Shape bedding course to provide<br />

continuous support for bells, joints, and barrels of pipes and for joints, fittings, and bodies of<br />

conduits.<br />

C. Trenches under Footings: Backfill trenches excavated directly under footings and to 24 inches<br />

beyond face of footings with Controlled Density Fill (CDF).<br />

Contract 44577 KW Annex - Rev. D 44577-CSI-SPEC-001 312000 - 5