01.10.2013 Views

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Sludge Treatment Project Engineered Container Retrieval and Transfer System December 2011<br />

7. Attach boxed end panels with concealed fasteners to conceal exposed ends of<br />

nonrecessed metal lockers.<br />

8. Attach finished end panels with fasteners only at perimeter to conceal exposed ends of<br />

nonrecessed metal lockers.<br />

D. Fixed Locker Benches: Provide no fewer than two pedestals for each bench, uniformly spaced<br />

not more than 72 inches apart. Securely fasten tops of pedestals to undersides of bench tops,<br />

and anchor bases to floor.<br />

END OF <strong>SECTION</strong> 105113<br />

Contract 44577 KW Annex - Rev. D 44577-CSI-SPEC-001 105113 - 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!