01.10.2013 Views

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sludge Treatment Project Engineered Container Retrieval and Transfer System January 2012<br />

G. Inspection and Test Reports required by ASME N511 for process area exhaust system.<br />

H. Certified Material Test Reports.<br />

I. Certificates of Conformance.<br />

J. Welding certificates.<br />

K. Field quality-control reports.<br />

1.5 QUALITY ASSURANCE<br />

A. Welding Qualifications: Qualify procedures and personnel according to the following:<br />

1. AWS D1.1/D1.1M, "Structural Welding Code - Steel," for hangers and supports.<br />

2. AWS D1.6/D1.6M, "Structural Welding Code – Stainless Steel," for stainless supports.<br />

3. AWS D9.1/D9.1M, "Sheet Metal Welding Code," for duct joint and seam welding.<br />

B. ASHRAE Compliance: Applicable requirements in ASHRAE 62.1-2004, Section 5 - "Systems<br />

and Equipment" and Section 7 - "Construction and System Start-Up."<br />

C. ASHRAE/IESNA Compliance: Applicable requirements in ASHRAE/IESNA 90.1-2004,<br />

Section 6.4.4 - "HVAC System Construction and Insulation."<br />

D. Manufacture, inspect, test and ship process area exhaust ductwork under a quality assurance<br />

program meeting the requirements of ASME AG-1, Article SA-8000.<br />

1.6 <strong>IN</strong>SPECTIONS AND TESTS<br />

A. Inspect and test the process area exhaust ductwork installation in accordance with the<br />

requirements of ASME AG-1, Article SA-5000, “Inspection and Testing” and Article TA-4300,<br />

“Duct, Housing, and Frame Acceptance Tests”.<br />

B. In-service test the process area exhaust system in accordance with the requirements of ASME<br />

N511.<br />

C. In-place leak testing of the final installed HEPA filters in the process area exhaust system in<br />

accordance with ASME N511 and ASME AG-1.<br />

1.7 DELIVERY, STORAGE, AND HANDL<strong>IN</strong>G<br />

A. Packaging, shipping, receiving, storage, and handling of the process area exhaust ductwork shall<br />

be in accordance with the requirements of ASME AG-1, Article SA-7000.<br />

1.8 ENVIRONMENTAL REQUIREMENTS<br />

A. Do not install duct sealant when temperatures are less than those recommended by sealant<br />

manufacturers.<br />

Contract 44577 KW Annex - Rev. E 44577-CSI-SPEC-001 233113 - 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!