01.10.2013 Views

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sludge Treatment Project Engineered Container Retrieval and Transfer System December 2011<br />

3.5 GROUND<strong>IN</strong>G<br />

A. For low-voltage wiring and cabling, comply with requirements in Division 26 Section<br />

"Grounding and Bonding for Electrical Systems."<br />

3.6 IDENTIFICATION<br />

A. Comply with requirements for identification specified in Division 26 Section "Identification for<br />

Electrical Systems."<br />

3.7 FIELD QUALITY CONTROL<br />

A. Perform tests and inspections.<br />

B. Tests and Inspections:<br />

1. Visually inspect cable placement, cable termination, grounding and bonding, and labeling<br />

of all components.<br />

2. Test cabling for DC loop resistance and shorts.<br />

C. Document data for each measurement.<br />

D. End-to-end cabling will be considered defective if it does not pass tests and inspections.<br />

E. Prepare test and inspection reports.<br />

END OF <strong>SECTION</strong> 260523<br />

Contract 44577 KW Annex – Rev. D 44577-CSI-SPEC-001 260523 - 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!